My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 4:36:05 PM
Creation date
8/9/2022 8:48:05 AM
Metadata
Fields
Template:
Contracts
Company Name
BYROM-DAVEY, INC. (SANTA ANITA PARK NEW SYNTHETIC SOCCER FIELD & PARK IMPROVEMENTS)
Contract #
P 19-7527
Agency
Public Works
Council Approval Date
7/19/2022
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Install of 240 36"skate stops per PCO#35R2. <br /> AGREED PRICE = $12,355.00 <br /> 7. Changes to the asphalt concrete paving specifications in the parking lot per PCO#36. <br /> AGREED PRICE = $39,649.00 <br /> 8. Removal of asphalt concrete originally shown to be grind and overlay per PCO#37. <br /> AGREED PRICE = $17,113.00 <br /> 9. New 6"fire line to the new riser room, which included plan check fees, labor, fittings, backflow <br /> assembly, and FDC connection & testing per PCO#CC-05 dated April 16, 2024. <br /> AGREED PRICE = $174,489.00 <br /> 10. Connection to existing 2° and 4"water lines, trenching, install of SCH 40 piping, backfilling, <br /> compacting, and pressure testing per PCO#CC-14 dated April 17, 2024. <br /> AGREED PRICE = $18,488.00 <br /> 11. Install of concrete retaining wall, bollard footing, 6"curb, 6" concrete pavement, concrete stairs, V- <br /> gutter, 4" concrete pavement, and concrete ramp per PCO #18.1 dated August 12, 2025. <br /> AGREED PRICE = $164,365.00 <br /> 12. Install of seven (7)overflow roof drain spouts per PCO#CC-23 dated October 23, 2024. <br /> AGREED PRICE = $8,531.00 <br /> 13. Geotechnical services for the retaining wall around the pool per PCO#CC-26. <br /> AGREED PRICE = $3,900.00 <br /> 14. Exterior lighting fixture changes per RFl #CC-029 work including type changes and an additional <br /> lighting inverter per PCO#CC-27 dated January 13, 2025. <br /> AGREED PRICE = $1,951.00 <br /> 15. Repair, locating of temporary site lighting, conduit repairs, EV conduit relocation, and a permanent <br /> site lighting conduit per PCO #CC-28 dated January 13, 2025. <br /> AGREED PRICE = $7,533.00 <br /> 16. Replacement of concrete flatwork from Phase 1 that was conflicting with improvements outlined in <br /> Phase 2 per PCO#CC-30.1 dated August 12, 2025. <br /> AGREED PRICE = $119,657.00 <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.