My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_8-22-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
8-22-22
>
Packet_8-22-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:43:39 PM
Creation date
8/23/2022 2:40:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Plan Exemption Checklist <br />City of Santa Ana Gary Avenue Business Park Project <br /> <br />51 <br />with a recognized scientific or educational repository, transfer to the tribe, or respectful <br />reinternment in an area designated by the tribe. <br /> <br />Proposed Project Applicability: Mitigation Measure CUL-6 is not applicable to the proposed Project because <br />the site has been determined to have very low sensitivity for archaeological resources. <br /> <br />CUL-7 If an Archaeological Resources Assessment does not identify potentially significant archaeological <br />resources but the site has moderate sensitivity for archaeological resources (Mitigation Measure <br />CUL-4), an archaeologist who meets the Secretary’s Standards shall be retained on call. The <br />archaeologist shall inform all construction personnel prior to construction activities about the proper <br />procedures in the event of an archaeological discovery. The pre-construction training shall be held <br />in conjunction with the project’s initial on-site safety meeting and shall explain the importance and <br />legal basis for the protection of significant archaeological resources. In the event that <br />archaeological resources (artifacts or features) are exposed during ground-disturbing activities, <br />construction activities in the immediate vicinity of the discovery shall be halted while the on-call <br />archaeologist is contacted. The resource shall be evaluated for significance and tribal consultation <br />shall be conducted, in the case of a tribal resource. If the discovery proves to be significant, the <br />long-term disposition of any collected materials should be determined in consultation with the <br />affiliated tribe(s), where relevant. <br /> <br />Proposed Project Applicability: Mitigation Measure CUL-7 is not applicable to the proposed Project because <br />the site has been determined to have very low sensitivity for archaeological resources <br /> <br /> <br />8/22/2022 <br />Planning Commission 2 – 90
The URL can be used to link to this page
Your browser does not support the video tag.