My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CROSSTOWN ELECTRICAL & DATA, INC
Clerk
>
Contracts / Agreements
>
C
>
CROSSTOWN ELECTRICAL & DATA, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 9:46:35 AM
Creation date
9/9/2022 4:39:04 PM
Metadata
Fields
Template:
Contracts
Company Name
CROSSTOWN ELECTRICAL & DATA, INC
Contract #
A-2022-157-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
10/10/2025
Insurance Exp Date
9/3/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE -ADVERTISEMENT <br />20 <br />Furnish & Install Overhead Reflectorized Street Name <br />EA <br />$ 1,050.00 <br />$ 4,200.00 <br />Si a NS <br />4 <br />21 <br />Install City Furnished Overhead Reflectorized Street <br />EA <br />Name Si SNS <br />4 <br />$ 450.00 <br />$ 1,800.00 <br />22 <br />Furnish & Install 12 Strand Single Mode Fiber Optic <br />LF <br />$ 3.15 <br />$ 945.00 <br />SMFO Cable <br />300 <br />23 <br />Furnish & Install 24 Strand Single Mode Fiber Optic <br />IF <br />SMFo Cable <br />300 <br />$ 4.75 <br />$ 1,425.00 <br />24 <br />Furnish & Install 144 Strand Single Mode Fiber Optic <br />IF <br />SMFo Cable <br />1000 <br />6.30 <br />6,300.00 <br />25 <br />Furnish & Fusion Splice I Stand SMFO <br />48 <br />EA <br />$ 42.00 <br />$ 2,016.00 <br />26 <br />Furnish & Fiber Optic Splice Enclosure <br />2 <br />SA <br />800.00 <br />4,000.00 <br />27 <br />Pothole Pole Locations for Utility Conflicts <br />5 <br />EA <br />,630.00 <br />$, 0.00 <br />28 <br />Fuunish and Install 3-M Vinyl Wrap by Econolite for <br />HA <br />e 332 Cabinet <br />5 <br />2 090.00 <br />0 10 450.00 <br />Samnle Task Order B — Street Lighting <br />(Assume all work wltldn Paved areas) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Furnish & Install Meter Service Pedestal per C.O.S.A. <br />Std. Plan on New Foundation <br />1 <br />EA <br />1 ,875.00 <br />11,8 55.00 <br />2 <br />Furnish & Install Double King Street Light Pole per <br />C.O.S.A. Std. 1126A on New Foundation <br />I <br />EA <br />$ 20,830.00 <br />$ 20,830.00 <br />3 <br />Furnish & Instal. Single King Street Light Pole per <br />C.O.S.A. Std.1126E on New Foundation <br />I <br />EA <br />$ 15,260.00 <br />$ 15,260.00 <br />4 <br />Furnish & Install Ameron Street Light Pole per <br />C.O.S.A. Std.1126H on New Foundation <br />1 <br />EA <br />$ 9,865.00 <br />9865.00 <br />5 <br />Furnish & Install 08 AWG Wire (Copper) <br />100 <br />LF <br />$ 2.00 <br />$ 200.00 <br />6 <br />Furnish & Install #10 AWG Wire Co er <br />100 <br />IF <br />S 1.50 <br />150.00 <br />7 <br />Furnish & Install #12 AWG Wire (Copper) <br />100 <br />LF <br />1.50 <br />$ 150.00 <br />8 <br />Furnish & Install #6 AWG Overhead Wire Aluminum <br />100 <br />IF <br />$ 10.00 <br />$ 1,000.00 <br />9 <br />Furnish & Install 2" Conduit PVC Schedule 40 <br />100 <br />IF <br />$ 125.00 <br />1 12,500.00 <br />10 <br />Furnish & Install 3" Conduit PVC Schedule 40 <br />100 <br />IF <br />, <br />11 <br />Furnish & Install No. 3 Pull Box <br />4 <br />EA <br />2,080.00 <br />8,320.00 <br />12 <br />Furnish & Install No. 5 Pull Box <br />I <br />FA <br />$ 2,875.00 <br />$ 2,875.00 <br />Sam le Task Order C — Concrete Paving - Wheel Chair Raml is <br />Description <br />Q <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />61.00 <br />33 550.00 <br />2 <br />PCC Sidewalk (T=4") <br />2,500 <br />SF <br />$ 17.25 <br />$ 43,125.00 <br />FItem <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />51.00 <br />153,000.00 <br />4 <br />FCC Curb and Gutter (C.OB.A. Std. Plan 1101, Type <br />A-2-S <br />100 <br />LF <br />5 <br />PCC Curb (C,O.S.A. Std. Plan 1101, Type B-1) <br />100 <br />LF <br />100.00 <br />10 000.00 <br />6 <br />PCC Spandrel (C.O.SA. Std. Plan 1109) <br />500 <br />SF <br />$ 55.00 <br />$ 27 500.00 <br />City of Santa Ana RFP 21-095 <br />Exhibit Page A1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.