Laserfiche WebLink
SANTAANA ON CALL CONSTRUCTION SERVICES <br />"Schedule of Hourly Billing Rates" <br />SUBCONTRACTOR NAME: SMITHSON ELECTRIC, INC. <br />RATES VALID THROUGH: <br />12/31/2022 <br />Olassifioatlon. • ' <br />Standard Time. <br />I.7-Nertime :'` <br />`Qoubletltne.r':' <br />Electrician - Foreman <br />$107.41 <br />$146,15 <br />$184.90 <br />Electrician -Bourne man <br />$98.73 <br />$133.14 <br />$167.65 <br />Laborer- Group 4 <br />$73.10 <br />$97.35 <br />$121,69 <br />Laborer -Group 1 <br />$69.89 <br />$92.54 <br />$116.18 <br />EQUIPMENT: <br />Qascripflon< <br />lJM; <br />Rats <br />F-550 Truck <br />HR <br />$ 39,41 <br />F-550 Truck <br />HR <br />$ 39,41 <br />F-560 Truck <br />HR <br />$ 39.41 <br />Vacuum/WaterTrk <br />HR <br />$ 60,39 <br />Trailer <br />HR <br />$ 15.67 <br />Concrete Saw <br />HR <br />$ 21.27 <br />Concrete Saw <br />HR <br />$ 21.27 <br />Hotmelt Machine <br />HR <br />$ 21.27 <br />Air Compressor <br />HR <br />$ 1916 <br />Arrowboard <br />HR <br />$ 3.48 <br />Arrowboard <br />HR <br />$ 3.48 <br />MATERIAL: <br />COST PLUS SALES TAX AND % MARK-UP <br />1, Hot Melt Sealant $0.81 perlb 30 Ibs per loop <br />2. Type 2 Loop Wire $0,23 per foot 20-30 ft per loop <br />