Laserfiche WebLink
ESTIMATE 120 <br />8-12-22 <br />Revised <br />Contract <br />Tina Davidson <br />120 w. Civic Center dr. <br />Santa Ana,Ca <br />714-40"158 <br />SALESPERSON <br />UANTITY <br />FGL FENCING <br />18216 KINGSDALE UNIT 3 <br />REDONDO BEACH ,CA 90278 <br />CELL:310-855-2041 <br />- LFE 1 -.,1: s i I corn <br />License # BL-LIC-039406 <br />Price Good for 30 Days from date of <br />Issue3-24-22 - - _.- <br />Due to Increased Cost of Raw Materials <br />r" <br />1212 JOB PAYMENT TERMS 50% DUE DATE <br />DESCRIPTION <br />50% Down <br />TOTAL <br />Black Powder Coated Steel Fence with Welded Spear #217 on each Picket <br />Scope of Work <br />FGL Fencing own uses Grade A -Steel- No Seconds Hand Steel -No Recycled Steel <br />All New Fence & Gates will be installed next to all Property Curbs on <br />1 % "Top & Bottom Rail-2" x 2" Post-3/4" Pickets -Commercial Grade -Welded Spear to each Picket <br />314' x 8' Phoenix Style Fence Square Tube Picket %" x %" 16 Ga <br />9-Custom Gates Steel Welded Lock Box with Dead Bolt <br />4- Double Gates Steel Welded Lock Box with Dead Bolt <br />1- Single Gate Steel Welded Lock Box with Dead Bolt <br />New Footage & Gates <br />1- 11' x 8' Double Gate North side of Driveway LA 400 M/S Motor-WH on outside of gates <br />1- 11' x 8' Sliding Gate South side of Driveway RSL 12UL Motor <br />Exit Loop -Card Reader -Card Reader Stand-50 Clamshell Cards -Motor Pad-V-Track slider <br />FGL Fencing will include all Spears # 217 on each picket at NO COST <br />Material Increase Cost $4000 included in Project Cost -Plus 2-Motors Exit Loop $5000 <br />Includes: Material -Labor -Tax -Removal <br />50% Down $19,000 <br />50% Balance $19,000 Total Sale: $38,000 <br />