Laserfiche WebLink
JAMIEFAGNANT I ARDURRA I Page2 <br />Recycled Water Line Creek Crossing, Leucadia Wastewater <br />District, (A. Project Engineer for the design of a 330-LF crossing of San <br />Marcos Creek via horizontal directional drilling for a replacement 12" <br />recycled waterline with fusible PVC. Project also included installation <br />of an isolation valve via the use of a linestop and replacement of an <br />isolation valve and installation of a blow -off on the District's Gafner <br />Water Reclamation Facility site. Project challenges included timing <br />construction to coincide with the closure of the Omni La Costa Golf <br />Course and specific contract requirements to limit damage to the <br />fairway and install replacement turf. <br />Batiquitos Pump Station Rehabilitation, Leucadia Wastewater <br />District, CA. Project Engineer for the preliminary and final design of <br />the rehabilitation of 1,000-hp sewer lift station. Project included <br />pump and valve replacement, wet well lining, station bypassing, site <br />piping, installation of emergency bypass vaults, modifications to the <br />existing valve vault, re -roofing, modification of the HVAC system and <br />other miscellaneous repairs. <br />Batiquitos Force Main Repairs, Leucadia Wastewater District, <br />CA. Design Engineer for the replacement in place of approximately <br />1,500 linear feet of dual 24" force main and 1,500 linear feet of 14" <br />secondary treated wastewater transmission main. Ardurra prepared <br />a comprehensive force main evaluation report summarizing all past <br />studies as well as current investigations of the force mains to determine <br />the remaining useful service life of the force mains. <br />Paseo Vivora Pipeline Replacement, Eastern Municipal Water <br />District, CA. Project Engineer for the design of 2,180 linear feet of 12" <br />fusible PVC water main. Project design included multiple connections <br />to existing facilities and associated valve packages, installation of new <br />water services and appurtenances, and abandonment by removal <br />of approximately 1,600 linear feet of existing overland steel pipe. <br />Ardurra assisted the District in preliminary design to determine the <br />most effective pipeline alignment taking into consideration easement <br />acquisition, ease of access, and current location ofEMWD facilities. <br />Groundwater Pilot Production Wells, City of San Diego, CA. Design <br />Engineerfor as -needed services to design pumping and conveyance <br />systems for groundwater production wells throughout San Diego County. <br />The City has an aggressive program to enhance its water supply system <br />by adding approximately 10,000 acre-feet/year of locally produced <br />groundwater to supplement the City's water supply system. To date, <br />the contract has included the following task orders:1) Pilot Production <br />Wells Investigation Workshop to identify candidate projects and develop <br />the initial scope forfuture investigation and design efforts; 2) Pilot <br />Production Well No.1 Improvements to design upgrades to the City's <br />San Vicente Production Well No.1 including new flow meter, pump to <br />waste piping, and SCADA and remote communications equipment; 3) <br />Overall Program Management- LISA (Local Investigations and Studies <br />Assistance) Program and miscellaneous technical assistance; and 4) <br />Design of Production Wellhead and Conveyance Facilities for Diamond <br />Business Improvement District (DBID) including a new 500-gpm <br />production wellhead facilities, controls, and pipelines to enable the City <br />to utilize groundwater for irrigation purposes. <br />Saxony Pump Station Rehabilitation, Leucadia Wastewater <br />District, CA. Project Engineer for the design of a pump station <br />rehabilitation for a 40-hp, 870-gpm sewer lift station. Project included <br />replacement of existing submersible pumps and motors with new <br />submersible chopper pumps, replacement of valve vault valves and <br />piping, replacement of PVC wet well lining, sewer bypassing, manhole <br />lining, installation of new LED site lighting, power monitors, automatic <br />transfer switch, uninterrupted power supply, emergency generator <br />connection and miscellaneous pump station site repairs. <br />Village Park No. 5 Pump Station Replacement, Leucadia <br />Wastewater District, CA. Project Engineer for pump station <br />rehabilitation project consisting of a new submersible duplex station, <br />valve vault, bypass connection, electrical upgrades, bypass pumping <br />and sequence of construction specifications. <br />Station 119/120 Concrete Reservoirs, Anderson Pacific/ <br />California Water Service Company, CA. Project Engineerfor <br />the design of two 0.4-MG conventionally reinforced concrete water <br />reservoirs, associated site piping and grading. Project included <br />obtaining a building and public works permit from the City of San <br />Carlos. <br />Lt West Side Sewer Force Main Replacement, Leucadia <br />Wastewater District, CA. Project Engineer for the design of 2,594 <br />linear feet of 24" sewer force main replacement and associated <br />appurtenances. Project included obtaining permits from multiple <br />agencies including Caltrans, North County Transit District and the City <br />of Encinitas. Project included installation of flexible expansion joints on <br />the existing ductile iron bridge crossing. <br />FY16 Gravity Sewer Main Repairs, Leucadia Wastewater District, <br />CA. Project Engineer for the design of 3,131 linear feet of cured -in -place <br />pipe lining, installation of cured -in -place manhole liner and three sag <br />repairs. Project also included the emergency installation of 355linear <br />foot cured -in -place pipe liner for a badly corroded 10" cast iron gravity <br />sewer on an expedited design basis. <br />Leucadia Scenic Cured -in -Place Pipe Lining, Leucadia <br />Wastewater District, CA. Project Engineerfor the design of 2,018 <br />linear feet of cured -in -place pipe lining in existing 12" gravity sewer. <br />Project included obtaining Caltrans encroachment permit. <br />ARDURRA B-10 City of Santa Ana Water Resources Division <br />RFP 22-002 I May 24, 2022 <br />