My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC. (6)
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:57:38 AM
Creation date
10/4/2022 11:09:35 AM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2022-158-05
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ON -CALL WATER RESOURCES ENGINEERING SERVICES <br />RFP NO.22-002 <br />Proposals shall explicitly state which category listed above (1-5) is being proposing on. If there <br />are any exceptions to the core of requested services above, proposers shall list said exceptions in <br />their proposal (matrix form). <br />GENERAL REOUIREMENTS AND PROJECT DELIVERABLES <br />The Consultant's services for plans specifications and estimates (PS&E) for engineering projects <br />and special studies/investigations shall be in conformance, if applicable, with the following: Title <br />24 of the California Code of Regulations (California Building Standards Code), American Water <br />Works Association, California Department of Transportation, Americans with Disabilities Act, <br />City of Santa Ana Municipal Code (SAMC), professional Standards established by the City, and <br />any other federal, state, or local guidelines required in the project. <br />As part of the PS&E package, the Consultant shall prepare the special provisions pertaining to the <br />items of work included in the plans that are not addressed on the latest editions of the applicable <br />standards. <br />The Consultant shall have complete responsibility for the accuracy and completeness of all <br />documents and plans prepared. The plans will be reviewed by the City of Santa Ana for conformity <br />with the requirements of the Agreement. Reviews by the City of Santa Ana DO NOT include <br />detailed review or checking of design for the accuracy with which such designs are depicted in the <br />documents and the plans. The documents and plans furnished under the Agreement shall be of a <br />quality acceptable to the City of Santa Ana. The criteria for acceptance shall be a product of neat <br />appearance, well organized, technically and grammatically correct, checked and dated, and having <br />the maker and checker identified. <br />The Consultant shall have project management control procedures in effect during the entire time <br />work is being performed under the Agreement. This task shall include the following: <br />• Project Management Plan- the consultant shall provide a detail management plan including <br />information and coordination with other agencies to ensure compliance and completion of <br />the (PS&E) packages. This plan shall include all milestones and task breakdown for each <br />of the tasks and subtasks included therein. The project management shall be submitted to <br />the Project Manager for review and within 15 calendar days of the issued Notice to Proceed <br />• Deliverables <br />• Quality Control/Quality Assurance (QA/QC) Plan <br />• Project Schedule/Invoicing <br />• Project Correspondence <br />City of Santa Ana RFP 22-002 <br />Page A1-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.