My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC. (6)
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 4:11:05 PM
Creation date
10/4/2022 11:09:35 AM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2022-158-05
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2025
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars prepared construction documents for the Baseline Road storm drain project. The <br />9'x7' box facility starts at Tamarind Avenue and drains east to outlet in Cactus Basin #3. The size <br />of the drainage infrastructure was optimized using the 2D hydraulic component of XPSWMM. <br />Drainage parameters are consistent with the Cactus Basin Drainage Study (San Bernardino <br />County Flood Control District, 2015) and the San Bernardino County Hydrology Manual. <br />A Composite Utility Plan was created based on record drawings gathered from wet and dry utility <br />companies. The Plan served as a key support to identify the most efficient horizontal and vertical <br />alignments, along with the definition of a trench detail. Coordination with DSOD was necessary to obtain <br />an encroachment permit for penetrating through the jurisdictional dam. Penetration design details include <br />1:10 concrete structures and articulated joints. The Cactus Basins provided significant flood mitigation <br />benefits to accommodate the undersized and erosion -prone Cactus Channel downstream of Baseline Road. <br />The project included the preparation of plan, specifications and estimates for the storm drain, street, and <br />utility relocation plans. A construction phasing plan was also prepared to minimize impacts on local traffic <br />and residents. <br />CLIENT CONTACT: <br />City of Rialto <br />Marcus Fuller <br />335 W. Rialto Avenue <br />Rialto, CA 92376 <br />909.820.2602 <br />RELEVANT DESIGN <br />COMPONENTS: <br />• Storm drain <br />improvements <br />• Utility relocations <br />• Street improvements and <br />design <br />• Environmental impact <br />report <br />• Water quality <br />HUNT MOLIARS <br />City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.