My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-10-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Agenda Packet_2022-10-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:15:27 PM
Creation date
10/17/2022 5:36:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1074
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pnrtalble Nce rl"Ks <br />CE- MERICA <br />9) Standard Supply of 12 degrees F, 16 degrees return and Capable Supply 5 degrees <br />F, return 10 degrees F <br />10) 38% mono -propylene glycol @ 010 degrees C <br />Evaporator <br />1) Shell and Tube heat exchanger <br />2) Maximum Flow Rate 360 gpm <br />3) Design Flow Rate 240 gpm <br />4) Minimum Flow Rate 120 gpm <br />5) Demineralized Water Volume JS gal 32 <br />6) Maximum Pressure 150psi <br />Connections <br />1) Field materials, valves and fittings <br />2) Evaporator Flange 4" for 4" camlocks and 4" hoses. 5" insulation on all water <br />and refrigerant lines <br />Regrigerant <br />1) R 404 mono -propylene glycol low temp refrigerant <br />2) 4, 425 gallon totes of mono -propylene glycol and demineralized water, a 38% <br />propylene glycol demineralized water solution to run rink tubing, chiller system & <br />tank <br />3) Anti foam bacterial disinfector: Bio 100 <br />4) Storage Expansion Tank 35-600 gallon <br />5) Rink piping system Complete Charge from factory <br />6) Glycol Vacuum Pump <br />7) Charge 146 lbs, 2 circuit 73 lbs each <br />8) MSDS mono -propylene glycol <br />Sound <br />1) 60 dBA @ 25ft <br />Set up and Breakdown <br />1) Factory Engineering Technical Support and 8 week warranty on all parts and <br />immediate replacement within 36 hours <br />2) Factory Startup <br />3) Training <br />4) Installation <br />5) Shipping <br />6) Removal <br />807 Sprucelake Drive, Harbor City, CA 90710 21 <br />Xe.i. 213=6_9423 <br />City Council swi11iams@ice-ar7aica?Am 10/18/2022 <br />Ice-America.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.