My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SEASIDE ICE, LLC DBA ICE-AMERICA (2)
Clerk
>
Contracts / Agreements
>
S
>
SEASIDE ICE, LLC DBA ICE-AMERICA (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 11:25:29 AM
Creation date
10/25/2022 1:26:09 PM
Metadata
Fields
Template:
Contracts
Company Name
SEASIDE ICE, LLC DBA ICE-AMERICA
Contract #
A-2022-214
Agency
Parks, Recreation, & Community Services
Council Approval Date
10/18/2022
Expiration Date
1/31/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICE-AMERICA <br />9) Standard Supply of 12 degrees F, 16 degrees return and Capable Supply 5 degrees <br />F, return 10 degrees F <br />10)38% mono -propylene glycol @ 010 degrees C <br />Evaporator <br />1) Shell and Tube heat exchanger <br />2) Maximum Flow Rate 360 gpm <br />3) Design Flow Rate 240 gpm <br />4) Minimum Flow Rate 120 gpm <br />5) Demineralized Water Volume JS gal 32 <br />6) Maximum Pressure 150psi <br />Connections <br />1) Field materials, valves and fittings <br />2) Evaporator Flange 4" for 4" camlocks and 4" hoses. 5" insulation on all water <br />and refrigerant lines <br />Regrigerant <br />1) R 404 mono -propylene glycol low temp refrigerant <br />2) 4, 425 gallon totes of mono -propylene glycol and demineralized water, a 38% <br />propylene glycol demineralized water solution to run rink tubing, chiller system & <br />tank <br />3) Anti foam bacterial disinfector: Bio 100 <br />4) Storage Expansion Tank 35-600 gallon <br />5) Rink piping system Complete Charge from factory <br />6) Glycol Vacuum Pump <br />7) Charge 1461bs, 2 circuit 73 lbs each <br />8) MSDS mono -propylene glycol <br />Sound <br />1) 60 dBA @ 25ft <br />Set up and Breakdown <br />1) Factory Engineering Technical Support and 8 week warranty on all parts and <br />immediate replacement within 36 hours <br />2) Factory Startup <br />3) Training <br />4) Installation <br />5) Shipping <br />6) Removal <br />807 Sprucelake Drive, Harbor City, CA 90710 21 <br />Tel: 323-776-9423 <br />s«2lliams n ice-america.com <br />Ice-America.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.