My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_09-26-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
9-26-22
>
Packet_09-26-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 9:57:22 AM
Creation date
11/7/2022 9:55:57 AM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2022-xx <br />Page 8 of 11 <br />EXHIBIT A <br />Conditions for Approval for Density Bonus Agreement Application No. 2020-03 <br /> <br />Density Bonus Agreement Application No. 2020-03 is approved subject to compliance, to <br />the reasonable satisfaction of the Planning Manager, with applicable sections of the Santa <br />Ana Municipal Code, the California Administrative Code, the California Building Standards <br />Code, and all other applicable regulations. In addition, it shall meet the following conditions <br />of approval: <br /> <br />The Applicant must comply with each and every condition listed below prior to exercising <br />the rights conferred by the Density Bonus Agreement. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the life <br />of the development project. Failure to comply with each and every condition may result in <br />the revocation/termination of the Density Bonus Agreement. <br /> <br />1. All proposed site improvements must conform to the Development Project (DP) <br />approval of DP No. 2021-38. <br />2. Any amendment to the DP No. 2021-38, including modifications to approved <br />materials, finishes, architecture, site plan, landscaping, unit count, mix, and <br />square footages must be submitted to the Planning Division for review. At that <br />time, staff will determine if administrative relief is available or if the Development <br />Project Review must be amended. <br />3. Walls and Fencing. <br />a. The applicant shall construct a minimum six-foot (6’) tall perimeter wall, as <br />measured from nearest adjacent finished sidewalk, surrounding the <br />project site. The perimeter wall shall conform to all applicable Citywide <br />Design Guidelines, including a split-face or painted design with regularly- <br />spaced pilasters and decorative cap. The applicant is responsible for <br />coordination with any adjacent property owners to avoid double-walls or <br />gaps between walls where possible. <br />b. Climbing vines shall be planted at regularly-spaced intervals along all <br />exposed walls and wrought-iron fencing to deter graffiti. All solid walls shall <br />be finished with anti-graffiti coating. <br />4. All mechanical equipment shall be screened from view from public and courtyard <br />areas. <br />5. Prior to issuance of building permits, the Applicant shall submit a construction <br />schedule and staging plan to the Planning Division for review and approval. The <br />9/26/2022 <br />Planning Commission 3 – 23
The URL can be used to link to this page
Your browser does not support the video tag.