ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. This Change Order Number 010, Item F provides additional compensation to Contractor for items <br /> as described in COR #047 — Flow Meter Cable Cover which includes furnishing and installing of <br /> vendor flow meter cable. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 010, Item F is one thousand, eight hundred thirty-two <br /> and 591100 dollars ($1,832.59). This sum constitutes full and complete compensation for <br /> furnishing all labor, materials, equipment, tools, transport, and incidentals including all overhead <br /> and markups by reason of this Change Order 010, Item F. Zero (0) working days are added as <br /> part of this Change Order 010, Item F. <br /> CHANGE ORDER NUMBER 010, ITEM F COST: $1,832.59 <br /> 7. This Change Order Number 010, Item G provides additional compensation to Contractor for items <br /> as described in COR #048 —Valve Box for Saddle which generally includes work to furnish and <br /> install valve vault box for saddle on MWD interconnection water line. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 010, Item G is three thousand, thirty-six and 501100 <br /> dollars ($3,036.50). This sum constitutes full and complete compensation for furnishing all labor, <br /> materials, equipment, tools, transport, and incidentals including all overhead and markups by <br /> reason of this Change Order 010, Item G. Three (3) working days are added as part of this <br /> Change Order 010, Item G. <br /> CHANGE ORDER NUMBER 010, ITEM G COST: $3,036.50 <br /> 8. This Change Order Number 010 Item H provides additional compensation to Contractor for items <br /> as described in COR #049 — Sump Pump Pipe Replacement which generally includes work to <br /> furnish and install metal sump pump above ground piping. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 010, Item H is two thousand, one hundred eighty-four <br /> and 751100 dollars ($2,184.75). This sum constitutes full and complete compensation for <br /> furnishing all labor, materials, equipment, tools, transport, and incidentals including all overhead <br /> and markups by reason of this Change Order 010, Item H. One (1) working days are added as <br /> part of this Change Order 010, Item H. <br /> CHANGE ORDER NUMBER 010, ITEM H COST: $2,184.75 <br /> Page 3of5 <br />