My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SMAART POWER, LLC
Clerk
>
Contracts / Agreements
>
S
>
SMAART POWER, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:21:38 AM
Creation date
12/19/2022 4:28:03 PM
Metadata
Fields
Template:
Contracts
Company Name
SMAART POWER, LLC
Contract #
A-2022-205-02
Agency
Public Works
Council Approval Date
10/18/2022
Expiration Date
10/17/2025
Insurance Exp Date
11/16/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o The curves will be in different colors for the ease of identifying. The devices' <br />labels along with their settings will be organized in a way that devices are <br />easy to distinguish and follow in an orderly fashion from upstream to <br />downstream. <br />o Fault clipping currents will be displayed in the TCC for each individual bus <br />identifying the max level of fault current that each device can clear. <br />o Each piece of one -line associated with the TCC will be neatly placed next to <br />the TCC for ease of identifying and associating the curves with the devices. <br />o Each TCC will be induvial studied for possible mis-coordination or selectivity <br />problems and any recommended adjustment for each TCC will be presented <br />in a separate TCC with the same TCC identifier with the "RECOMMENDED" <br />revision so the client can easily compare the recommended changes. <br />o A list of all the created TCCs will be included in the report with their TCC <br />identifier tag so the client can easily find the TCCs per their page number in <br />the report. <br />o Not all the devices and their settings can be adjusted to achieve desired <br />coordination and/or selectivity therefore additional recommendations may be <br />provided such as replacing the equipment, upgrading the trip devices or <br />rating plugs, etc. <br />o The format of the TCCs can be consulted with the City of Santa Ana and <br />accommodated as desired in advance. <br />o Each TCC will demonstrate the phase settings of the devices following to the <br />next TCC with the ground settings (if applicable) and also following a TCC <br />with the recommended settings (if applicable). <br />Existing and recommended settings of all the devices (adjustable) will be presented <br />in a tabular format following the TCC section in the report in separate tables for low <br />and medium voltage equipment. If there are other types of devices such as vacuum <br />interrupters, differential relays, etc. those will be presented in separate tables. This <br />format can be adjusted as desired per City of Santa Ana requirements in advance. <br />All the findings, recommendations and solutions will be presented in the executive <br />summary section of the report. <br />4.4.Arc Flash Study <br />As arc flash objectives was mentioned in section 1.1, the following demonstrates <br />the practical approach and steps to the arc flash study per the following: <br />o All the guidelines required by the latest IEEE-1584 and NFPA-70E will be <br />followed in order to calculate the incident energies for each individual <br />equipment included in the models. <br />o As required by IEEE-1584 2018 the enclosure dimensions (width, depth and <br />height) will be measured during the data collection (or obtained from the <br />shop drawings/submittals) to accurately calculate the incident energies per <br />
The URL can be used to link to this page
Your browser does not support the video tag.