My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SMAART POWER, LLC
Clerk
>
Contracts / Agreements
>
S
>
SMAART POWER, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:21:38 AM
Creation date
12/19/2022 4:28:03 PM
Metadata
Fields
Template:
Contracts
Company Name
SMAART POWER, LLC
Contract #
A-2022-205-02
Agency
Public Works
Council Approval Date
10/18/2022
Expiration Date
10/17/2025
Insurance Exp Date
11/16/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6. Common Problems / Observations <br />The following improvements to the potential issues which can be common and/or <br />typical can be recommended in respect to the developing the arc flash models and <br />study for the City of Santa Ana electrical systems: <br />o Coordinating and arrangements with the utility company and identifying the <br />designated engineer in there ahead of time in order to obtain the available <br />fault current(s) for the system study. <br />o Coordination between the client (City of Santa Ana) and the contractor in the <br />kick off meeting(s) to allocate specific times and technicians familiar with the <br />job -site for the data collection activity in order to avoid delays. <br />o Providing the existing documentations and past reports to assist contactor <br />reviewing and identifying what needs to be performed ahead of time in order <br />to get ready for the data collection effort. This also possibly includes the type <br />of relays that have been installed in the field for preparation purposes. <br />o Making sure that the contractor has access to the electrical rooms and <br />equipment in the normal hours. Coordinating with the contractor for outside <br />of the normal hours. <br />o Identifying the proper tools / equipment prior to the data collection effort in <br />order to avoid delays. For some older / newer relays proper software or tools <br />are needed in order to read/download the settings of the relays. <br />o Coordinate shutdowns (if required) and proper lighting in case of shutdowns <br />for the data collection activity. <br />SMAART POWER is dedicated to provide a high quality service to all of its <br />customers as it currently has with a very high rate of satisfaction. The <br />responsiveness, being on -time and addressing the issues with the deep <br />understanding of the power systems and problem solving capabilities, makes us <br />one of a kind in the industry. We make sure all the details and corners are <br />covered and nothing is left behind or unresolved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.