My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SMAART POWER, LLC
Clerk
>
Contracts / Agreements
>
S
>
SMAART POWER, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:21:38 AM
Creation date
12/19/2022 4:28:03 PM
Metadata
Fields
Template:
Contracts
Company Name
SMAART POWER, LLC
Contract #
A-2022-205-02
Agency
Public Works
Council Approval Date
10/18/2022
Expiration Date
10/17/2025
Insurance Exp Date
11/16/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each substation was successfully energized and commissioned and all tests were <br />passed according to the power system study report for this project. <br />Project-3: Los Angeles Metropolitan Transportation Authority — Los Angeles, CA <br />Year Completed: 2021 <br />Client Name: LOS ANGELES METROPOLITAN TRANSPORTATION AUTHORITY <br />Contact. Teo Dominguez <br />Phone: (818) 763-9179 <br />The scope of this project was to model three entire stations of the "Los Angeles <br />Metropolitan Transportation Authority" (East/West 1 st Central Stations, East/West 2nd <br />Broadway Stations and East/West 2nd Hope Stations) with a lot of upgrades to the <br />existing equipment, new installations of breakers and relays, and extending the power <br />distribution to the new circuits. <br />The analysis included coordinating with the upstream 34.5kV circuits with <br />normal/reserved power from the utility and two feeds for each station. Each station has <br />very large motors and a bunch of smaller motors with LIPSs. <br />The new installations as well as replacements/upgrades/retrofits to the exiting breakers <br />needed to be evaluated for the available fault currents from the utility. In addition, the <br />entire stations for all three needed to be re-evaluated for the coordination study, and <br />new and recommended settings had to be provided. Arc flash study needed to be <br />performed for all three stations as well. <br />During the short circuit study, a few breakers/MCCs failed. Looking further into the study <br />and verifying the actual operation of some of the larger motors, we found out some of <br />them operated intermittently and not at the same time. That alleviated the problem of <br />high fault currents contributing from those larger motors. <br />We also came across situations that by adjusting and recommending settings for some <br />of the breakers to achieve proper coordination and selectivity, the incident energies on <br />some of the equipment would go higher. We also suggested the replacement of the <br />breakers with more advanced electronic trip devices to mitigate the incident energies. <br />However, due to the associated cost, the owner decided to stay with the current <br />equipment. <br />The owner of the project also decided to utilize the recommended settings for some of <br />the non -critical circuits, which could be de -energized for performing work on them. For <br />the rest, the old settings were utilized to keep the incident energies down while <br />compromising selectivity since those circuits could not be de -energized prior to work <br />since they were part of the critical circuits and had to be kept energized at all times. <br />7. Electrical Safety Program <br />SMAART POWER will create and implement a Safety Program which will be in <br />accordance with the guidelines set out by OSHA and the 70E requirements for electrical <br />safety in the workplace, based on the specific needs of the Santa Ana Public Works <br />Agency. The Safety Program will include, but not be limited to the following: <br />- Defining the requirements to meet safety standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.