Laserfiche WebLink
GLENDALE COMMUNITY COLLEGE: <br />VERDUGO GYM EXPANSION & ADA/ <br />SEISMIC UPGRADES <br />This project consists of anew $31M, 16.400 SF, 2-story gym addition <br />to the existing Verdugo Gym, The new structure is steel framed _ <br />at the upper gym level with buckling restrained braced frames for <br />seismic, resting on a concrete podium for locker and fitness rooms at <br />the lower level. <br />The scope also included a voluntary seismic upgrade to the existing <br />39,000 SF Verdugo Gyma concrete structure with a wood sheathed <br />roof. The upgrade focused on properly anchoring the concrete walls <br />to the roof. <br />This project incorporated sustainable and Twellness design and <br />pursued LEECH certification. <br />Services .. _g,r, f :..,n I'A,:n, u Zr - [e _:,.r I _-I1 <br />?g ,F:a <br />CITY OF SANTA ANA- NEV CC Id MUNITY CENTER 1 17 <br />