My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:54:09 PM
Creation date
2/7/2023 2:47:39 PM
Metadata
Fields
Template:
Contracts
Company Name
EVERLEVEL HOLDINGS, LLC
Contract #
P 22-1341
Agency
Public Works
Council Approval Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 22-1341 First Street Slope Stabilization Project Change Order Number <br />To Everl.evel Holdings, LLC Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included In the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment Is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />JUSTIFICATION <br />1. To compensate the contractor for costs associated with discovery unforeseen 8" utility lines <br />in slope subgrade excavation and removal. (PCO No. 01). <br />TOTAL COST = $9,863.78 / <br />2. To compensate the contractor for costs associated with relocation of CMS boards per City's <br />request. (PCO No. 02). <br />TOTAL COST = $623.42 <br />3. To compensate the contractor for costs associated with additional traffic control as per City's <br />request including additional arrows and barricades. (PCO No. 03). <br />TOTAL COST = $4,544.83 <br />4, To compensate the contractor for costs associated with removal of two abandoned telephone <br />poles on the South side of the slope. (PCO No. 04) <br />TOTAL COST = $2, 517.55 <br />5. To compensate the contractor for costs associated with additional potholing on SE slope <br />including backfill for all locations. (PCO No. 05). <br />TOTAL COST = $9,518.96 <br />6. To compensate the contractor for costs associated with backfill of anchor trench due to plan <br />change per City direction. (PCO No. 06). <br />/ <br />TOTAL COST = $4,762,66 <br />7. To compensate the contractor for costs associated with removal of backflow preventer and <br />capped line at the main per City's request. (PCO No. 07). <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.