My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:54:09 PM
Creation date
2/7/2023 2:47:39 PM
Metadata
Fields
Template:
Contracts
Company Name
EVERLEVEL HOLDINGS, LLC
Contract #
P 22-1341
Agency
Public Works
Council Approval Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. To compensate the contractor for costs associated with chipping the bottom of the anchor wall <br />to facilitate the new, widened sidewalk (PCO No. 19). <br />TOTAL COST = $31,773.17 �-' <br />Delete Bid Item Quantities <br />Bid Item #12: Remove unused bid item quantities for Bid Item #12. Two Hundred Linear Feet <br />was not used in the project @ $250.00 per Linear Feet. <br />TOTAL CREDIT AMOUNT = ($50,000.00) <br />TOTAL AGREED CHANGE ORDER COST: $585,519.63 <br />TOTAL AGREED CONTRACT INCREASE COST: $536,619.53 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.