Laserfiche WebLink
(c) Install a fence, if required, and Green Screen. <br />Throughout the duration of the License Agreement, the Licensee shall: <br />a) Cover all stockpiles that are not actively being used or scheduled to be used within a <br />seven (7) day period. Additionally, all stockpiles shall be covered prior to the onset <br />of precipitation. Licensee shall ensure that stockpile coverings are installed securely <br />to protect from wind and rain. Licensee shall only be allowed to stockpile <br />construction materials or sediment that is directly related to their City of Santa Ana <br />Capital Improvement Project. <br />b) Maintain effective Tracking control BMPs to prevent off -site sediment tracking from <br />the License Area. <br />c) Maintain effective Sediment control BMPs along the entire perimeter of the License <br />Area, at all adjacent storm drain inlets, and on all non -active slopes, as appropriate. <br />d) Sweep the street, sidewalk, and parkway adjacent to the License Area at the end of <br />the working day and prior to forecasted rain events. <br />e) Use a dumpster or appropriate waste receptacle to discard of all trash and debris. <br />Dumpsters and waste receptacles shall be covered prior to the onset of precipitation. <br />f) Implement Wind Erosion Control BMPs (dust control), as appropriate, per the WE-1 <br />detail provided in the California Stormwater Quality Association (CASQA) <br />Stormwater BMP Handbook for Construction. <br />g) Remove graffiti on the fence or green screen within one (1) day of notification by the <br />City. <br />h) Repair vandalism to fence or green screen within one (1) day of notification by the <br />City. <br />Remove weeds or vegetation growing within License Area or around perimeter <br />within seven (7) days of notification by the City. <br />Within fourteen (14) days of vacating the License Area, the Licensee shall clean up the License <br />Area as outlined below: <br />a) Remove all trash, debris, sediment, stockpiles, and construction materials from the <br />License Area. <br />b) Remove old and/or damaged sediment control BMPs from the License Area and <br />install new sediment control BMPs along the entire perimeter of the License Area. <br />Appropriate sediment control BMPs include straw wattle, gravel bag berm, or silt <br />fence. Licensee shall install sediment control BMPs per the SE-5, SE-6, or SE-1 <br />details provided in the California Stormwater Quality Association (CASQA) <br />Stormwater BMP Handbook for Construction. <br />c) Remove Tracking Control BMPs from the License Area. <br />d) Cover the surface of the entire License Area with two (2) inches of three-quarter <br />(3/4) inch diameter gravel. <br />License Area clean up shall be completed to the sole satisfaction of the City no later than <br />the times specified in the License as stated in paragraph 1 above, and the License shall be <br />extended to such time for the limited purpose of allowing the clean up to be completed. <br />4. Dama¢e. In the event that Licensee damages any portion of the License Area or the <br />improvements or equipment therein, Licensee shall immediately repair the damage at Licensee's sole <br />cost. Alternatively, the City may, at its election, repair the damage in which case Licensee shall <br />reimburse the City for its cost within fifteen (15) days of receipt of written demand from City. <br />5. Licensee Parties. Licensee, together with its employees, subcontractors, agents, <br />representatives, and all persons entering the License Area, by or through or at the direction of Licensee, <br />Page 2 of 5 <br />