My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-03-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Agenda Packet_2023-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:45:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/7/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6995 <br />BRISTOL ST AND SANTA CLARA AVE TRAFFIC SIGNAL MODIFICATION <br />FEDERAL PROJECT NO.: HSIPL 5063(204) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Fleenor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Modification <br />1 <br />LS <br />$ <br />$ <br />Z(.3,000 <br />2.3,000 <br />2 <br />Install Video Detection System at <br />Bristol St Santa Clara Ave <br />1 <br />LS <br />$ <br />y2,3oo <br />$ <br />42 'Do <br />and <br />3 <br />* Install 2" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />'jp <br />7,000 <br />4 <br />* Install 3" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />l00 <br />10,000 <br />5 <br />* Install 4" PVC Conduit per Plan <br />500 <br />LF <br />S� <br />S <br />000 <br />yD, <br />6 <br />* Install No. 6 Pull Box <br />6 <br />EA <br />$1�205 <br />'I,Z30 <br />7 <br />* Install No. 6E Pull. Box <br />2 <br />EA <br />$ Sgs <br />it <br />$ 110 <br />' <br />8 <br />* Remove and Replace Concrete <br />100 <br />SF <br />$ <br />$ <br />Sidewalk <br />(oq .50 <br />(or{SO <br />9 <br />Cold Mill (2") <br />5900 <br />SF <br />$ <br />$ <br />2 •�5 <br />1GAS <br />10 <br />Asphalt Rubber Hot Mix (ARHM) <br />74 <br />TN <br />$ <br />70 -24 <br />Abr� <br />11 <br />Temporary Overhead Wiring at <br />1 <br />LS <br />$ <br />$ <br />Bristol St and Santa Clara Ave <br />k(o'Soo <br />((o,S� <br />12 <br />Pothole Pole Locations for Utility <br />Conflicts <br />8 <br />EA <br />$ o� <br />$(o,g00 <br />13 <br />Pothole Utility Not Shown on Plans <br />4 <br />EA <br />$QS) <br />$ 400 <br />City Council 12 - 48 3/7/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.