My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PFAS TREATMENT SYSTEVIS <br />APPENDIX <br />ATTACHMENT 2: FEE PROPOSAL <br />Certification - I certify that I have read, understand and agree to the terms and conditions of <br />this Request for Proposal. I have examined the ATTACHMENT 1; SCOPE OF WORK. i am <br />familiar with all the existing conditions and limitation that may impact work requests. I <br />understand and agree that I am nMonsible for reporting any errors. ornisslons or discrepancies <br />to the Cdy for clarification prior to the submission of my proposal. <br />Proposer shall submit hourly rates schedule, which shall inctude but not limited to,direct <br />and indirect costs for labor, for staff per job classificatlon, material, equipment rates, <br />overhead, incidental supplies, travel, mileage, and fuel. Any special materials will be <br />purchased by the contractor only after discussed and authorized by the City projects <br />manager or designee in writing. <br />Prior to commencement of services, Contractor shall provide separate quotes, upon <br />request by the City, which shall be approved by the City's Public Works Water Resources <br />Division, <br />FEE SCHEDULE <br />The undersigned declares Mt hefshe has carefully examirt-d the request for proposal, that <br />helshe has examined the Proposed Scope of Services, and hereby proposes Irr rumish all <br />material and do all the work required to complete the said work in accordance with said Proposed <br />Scope of Services, for the unit pries} set forth in the Following schedule: <br />Note: This contract is subject to prevailing wages. <br />TO: CITY COUNCIL OF THE CITY OF SANCTA ANA <br />FROR EEC ilnvironmewal <br />,. <br />Item # Bid item <br />Unit Quantily Amour <br />Wei 126 (Located at 1730 S. Santa Fs, 'Sa nW Ana, CA 92705) <br />Priam ref -or I91h6 APPENDICES A. B. and C for further details on Well 26 and East Station reservoir Site <br />1, <br />Planning Study { <br />EA <br />i <br />S 19 INdl7,[7U <br />L <br />Draft Design Report(10% Desigin) <br />EA <br />1 <br />1�3Ot]0_G11 <br />3. <br />Final Dmign Repod (3D% Design) <br />EA <br />d, <br />60% Design Submittal <br />EA <br />1 <br />S 15G,t)[w].00 <br />City of Santa Arta: RFP 22,133 <br />On -Gall <br />City Council <br />24 19 — 294 <br />4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.