My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Agenda Packet_2023-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 10:50:01 AM
Creation date
4/13/2023 10:31:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. ADDITIONAL INFORMATION (if applicable) <br />NOTE: Only complete this section if you implement a platform other than SolarAPP+ <br />Please identify whether the following features are supported by the implemented <br />platform. All features are required for the platform to qualify for funding. CEC staff will <br />verify prior to payment approval. <br />Performs an automated plan review for residential solar energy <br />systems that completes automatic code compliance checks based <br />❑ <br />❑ <br />on user inputs (such as a contractor), thereby enabling or <br />Yes <br />No <br />otherwise issuing permits instantly when the project is confirmed <br />as code compliant, without the need for human review <br />Supports online, immediate fee payment once an application is <br />❑ Yes <br />❑ No <br />complete, which may include auto -invoicing of permit fee costs <br />Supports immediate generation of a permit job card following <br />❑ Yes <br />❑ No <br />payment confirmation <br />Blocks noncompliant applications from receiving a permit <br />❑Yes <br />❑ No <br />EITHER: 1) Stand-alone permitting tool; OR 2) Integrates with <br />❑ Yes <br />❑ No <br />current software and inspection platform already in use <br />S. REPORTING (REQUIRED) <br />Following adoption and verification of a qualifying platform, the <br />Energy Commission may request, and the Recipient will provide if <br />requested, annual data on the number of permits issued for solar <br />energy systems and a solar energy system paired with an energy <br />0 Yes <br />❑ No <br />storage system including relevant characteristics of those systems, <br />such as system capacity. <br />Please indicate your acceptance of these terms. <br />November 2022 Paae 3 of 4 APP-22-045 <br />City Council CaIAPP AttachmenQy — 9 City o4"12023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.