Laserfiche WebLink
Well 32 Rehabilitation Project <br />May 2, 2023 <br />Page 3 <br />3 <br />4 <br />0 <br />5 <br />Bid Results Summary <br />Rank Bidder’s Name Location Base Bid <br />1 Pacific Hydrotech Corp.Perris, CA $12,795,865 <br />2 MMC, Inc.La Palma, CA $12,921,518 <br />3 Metro Builders & Engineers <br />Group, Ltd.Newport Beach, CA $13,295,772 <br />4 Myers & Sons Construction, <br />LLC.Sacramento, CA $13,763,000 <br />5 Caliagua, Inc.Anaheim, CA $13,868,504 <br />NR GMZ Engineering, Inc.Westlake Village, CA Non-Responsive <br />A total of six bids were received, but only five were deemed responsive. Pacific <br />Hydrotech Corp., submitted the lowest responsive base bid in the amount of <br />$12,795,865 (Exhibit 2). As specified in the bid documents, the lowest bid shall be <br />determined on the basis of the Base Bid. Based on the bid analysis and a contractor’s <br />reference check, staff recommends awarding the construction contract to Pacific <br />Hydrotech Corp., in the amount of the base bid totaling $12,795,865 (Exhibit 3). <br />The lowest bidder was GMZ Engineering, Inc. with a base bid amount of $12,045,735. <br />After reviewing the bid proposal GMZ Engineering, Inc., it was deemed non-responsive <br />and non-responsible. GMZ Engineering, Inc. was non-responsive because their bid <br />proposal did not include the DBE Good Faith Effort documentation. GMZ Engineering, <br />Inc. was deemed non-responsible as well because their bid and relevant experience <br />demonstrated insufficient familiarity with the project’s scope of work outlined in the <br />contract documents. Therefore, the second lowest bidder, Pacific Hydrotech Corp., was <br />selected to be awarded this project with a base bid of $12,795,865. <br /> <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction management and administration, inspection, <br />and testing, along with an allowance for contingencies to account for unexpected or <br />unforeseen conditions. <br />On June, 21, 2022, the City Council awarded a contract of $1,224,820 to Butier <br />Engineering for Construction Management services including construction <br />administration and inspection duties. Construction administration and inspection <br />includes construction management; inspection of the Contractor’s work to ensure <br />contract compliance, workmanship, and quality; and materials testing. As indicated in <br />  <br />  <br />City Council 15 – 3 5/2/2023