RI 6WDQWHFProject Name and Location Client Project Status Services Provided Description of Project (Challenges and Solutions) Reference Task Order Team MembersStantec Consulting Services Inc.Rancho Los Amigos National Rehabilitation Center Utility and Tunnel SurveyLos Angeles CountyDepartment of Public Works, ProjectManagementDivisionOngoing Topo mapping of utilities and tunnelsChallenges: confined space for surveying, safety Solutions: adhered to all safe work practices, clear communication with Los Angeles County Department of Public WorksYugal LallSenior Capital Projects Manager, Project Management Division II(626) 476-2837ylall@dpw.lacounty.govGreg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason ShockleySouth Whittier Outfall Sanitation Districts of Los Angeles CountyCompleted 12/2017 Aerial control, topo survey and mapping, manhole surveys, and right-of-way mappingChallenges:schedule was critical Solutions: well-organized scope with closely managed staff delivered the project within the critical scheduleMichael Tatalovich, Section Head, Sewer Design Section(562) 908-4288 mtatalovich@lacsd.orgRobert Gardner, Supervising Designer, Sewer Design Section(562) 908-4288 ext 1615 rgardner@lacsd.orgGreg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason ShockleyGreen Lane Pump Station Sanitation Districts of Los Angeles CountyCompleted 8/2017 Aerial control, topo survey and mapping, manhole surveys, and right-of-way mappingChallenges: schedule was critical Solutions:well organized scope with closely managed staff delivered the project within the critical scheduleMichael Tatalovich, Section Head, Sewer Design Section(562) 908-4288 mtatalovich@lacsd.orgRobert Gardner, Supervising Designer, Sewer Design Section(562) 908-4288 ext 1615 rgardner@lacsd.orgGreg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason ShockleyCabrinha Hearn & Associates ExperienceWestside Extension, Segment 1Los Angeles, CAWEST JV/METRO 10/2013 - Ongoing Horizontal and vertical project control verification and densification survey; exploratory shaft site monitoring; as-built surveys and mapping; advanced utility relocation layout and construction staking; utility plan verifications; monument preservation/restoration, topographic design/as-built mapping; and western station track alignment and platform as-builtChallenges: heavy rail, 9-mile subway extension project under construction; tunneling under heavily populated areasSolutions:as-built mapping provided to accommodate utilities relocation often with less than an 8-hour request window to enable the design/build team to accurately locate utilities for station box/decking design and placementJoe DeMelloLA Metro Director, Construction Management Westside Extension(323) 900-2112 demelloj@metro.netCamden Cabrinha, Jamie Bertchume, Edward Uribe, Rene Rodriguez, Bernard XuGPSi ExperienceLADWP 230 KV Scattergood Plan and ProfileLos Angeles, CALos Angeles Department of Water and Power (LADWP)/Stantec2/2016 - 3/2016 As subconsultant, provided: photogrammetric mapping 1”=40’, 1-foot contours, orthosChallenges: LAX is one of the busiest airports in the world with difficult low altitude flying directly in the AP take off zoneSolution: aerial survey and photogrammetric mapping 1”=40’ w/ 1’ CI, 11 linear miles; flight coordination with air traffic control Tessie Barriga PEStantec(949) 923-6946tessie.barriga@stantec.comRamon Ramos, Maria Alice Ramos, Paul Hamilton-RiversSediment Augmentation ProjectSeal Beach CAFish & Wildlife Services4/2016 - 5/2016 As prime, provided: photogrammetric mapping 1”=20’, 0.5-foott contours, 4-band orthosChallenge:revitalization and preservation of the Seal Beach wetlands requiring coordination with multiple Federal agencies, such as USGS and Fish & Wildlife ServicesSolution:aerial survey and photogrammetric mapping 1”=20’ w/ 0.5’ CI, collecting point data using SGM methods whilst still achieving a very high accuracy set of mapping deliverables along with four-band digital orthophotographyKirk Gilligan, Refuge Manager Fish & Wildlife Services(909) 982-4601kirk_gilligan@fws.govRamon Ramos, Maria Alice Ramos, Paul Hamilton-Rivers  <br />  <br />City Council 16 – 111 5/2/2023