My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-05-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Agenda Packet_2023-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:08:31 PM
Creation date
4/26/2023 4:57:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 | February 28, 2023 | David Evans and Associates, Inc. <br />Proposal to provide <br />Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 <br />J. Landscape and Irrigation Plans <br />J.1 – Site / Construction Plan <br />DEA landscape architects will provide a site plan for the proposed items of construction. This plan will <br />designate features of the proposed project including placement, detail references, material and manufacturer <br />callouts, general construction notes, and specific elements of the overall design which are necessary for the <br />proper construction of proposed items. At this time, we anticipate that the park will include some or all of the <br />amenities noted under 'Public Input'. Please note that we have not included structural calculations for items <br />such as the shade shelter. <br />Deliverables: 1” = 20’ scale site plan. <br />J.2 - Planting Plans <br />Plans will include a plant legend indicating trees, shrubs, <br />and ground covers in addition to information regarding the <br />placement of materials such as decomposed granite, mulch and <br />boulders. The legend will indicate the botanical and common <br />names, quantity, size, and remarks (such as variety and staking <br />procedure). The plans will provide an appropriate palette utilizing <br />sustainable landscape materials including California-friendly, <br />drought tolerant plants. <br />Deliverables: 1” = 20’ planting plan and details as noted above. <br />J.3 - Irrigation Plans <br />The irrigation plans will provide the necessary information for a complete and fully automatic irrigation system <br />for the approximate 1.27 acre park. The plans will indicate the point of connection based upon agency <br />requirements, backflow prevention and pressure regulation (as necessary), and equipment size and type in <br />the irrigation legend. “Smart” Water Application Technologies (SWAT) will be utilized. Flow monitors, moisture <br />sensors, and ET based controllers will be implemented. We also anticipate providing the following information: <br /> ■Prepare water usage calculations (MAWA and ETWU). <br /> ■Provide water efficient landscape worksheet and hydrozone table for each remote control valve. <br /> ■Obtain horticultural soils report (agronomic data) based on soil samples obtained from site. <br /> ■Provide irrigation run time schedule based on soil type. <br /> ■Rain and wind sensors will be added in addition to WUCOLS water use classifications. <br />Deliverables: 1” = 20’ irrigation plans and details as noted above. (Recycled water is not anticipated). <br />J.4 - Skate Park Plans (OPTIONAL) <br />J.4a - Project kick-off meeting <br />Spohn Ranch and the City will kick-off the project via an in-person or virtual meeting. We will review the project <br />goals, project schedule, and points of coordination. <br />Deliverables: Meeting Minutes (PDF). <br />J.4b - Information Gathering & Review <br />During the project kick-off meeting, Spohn Ranch and the City will take stock of existing site data, studies and <br />any other information pertinent to the project and project site. We will review existing information and work with <br />the City to collect additional information as necessary. The site information typically required to begin design <br />work is as follows: <br /> ■Site survey (AutoCAD). <br /> ■As-built drawings. <br /> ■Geotechnical report. <br /> ■Any master plan design work or future improvements planned for the site. <br /> ■Any local, state or federal design requirements. <br /> <br /> <br />City Council 17 – 35 5/2/2023
The URL can be used to link to this page
Your browser does not support the video tag.