Laserfiche WebLink
PM/LA LA/QA SID SLD LCAD PME CQA PE ENG HYDENG CCORD ADM SVY EE GEO ENV SPOHN Total Reim. <br />$185 $200 $155 $155 $125 $230 $225 $200 $180 $225 $130 $130 LS LS LS LS LS $$ <br />A Project Coordination 30 6 4 7,450$ 100$ <br />B Records Research 4 4 2 4 4 2 3,320$ 100$ <br />C.1 Conceptual Plan (30%), 3D Exhibit / Final Schedule 24 4 4 50 4 12 8,500$ 23,690$ 250$ <br />C.2 Preliminary Hydrology and Hydraulics Analysis 1 2 4 8 40 4 2 12,765$ 100$ <br />D Topographic Survey 1 2 11,500$ 12,145$ 200$ <br />E Preliminary WQMP 1 2 4 40 16 2 12,685$ 100$ <br />F Public Outreach and Project Meetings 16 12 24 8,360$ 500$ <br />G Utility Coordination 2 2 2 8 4 4 3,760$ 100$ <br />H Environmental (TBD)6 3 6 58,900$ 61,990$ 200$ <br />Final Construction Documents (90%-100%) <br />I.1 Geotechnical Investigation and Report 1 2 2 20,275$ 21,180$ 500$ <br />I.2 Horizontal Control Plans 2 1 4 6 16 2 5,840$ 100$ <br />I.3 Grading and Drainage Plans 4 6 6 16 48 2 15,570$ 100$ <br />I.4 Composite Storm Drain, Sewer and Water Plan 2 2 4 16 40 2 12,390$ 100$ <br />I.5 Erosion Control Plan 2 1 1 1 8 2 2,725$ 100$ <br />I.6 Final Water Quality Management Plan 1 2 4 24 16 4 9,745$ 100$ <br />J.1 Site Construction Plan 40 8 90 2 20,510$ 100$ <br />J.2 Planting Plan 16 4 60 11,260$ 100$ <br />J.3 Irrigation Plan 4 120 2 19,600$ 100$ <br />J.4 Skate Park Plan 4 1 9,500$ 10,440$ 100$ <br />J.5 Landscape Construction Details 20 10 80 15,700$ 100$ <br />J.6 Final Color Rendering 4 1 32 4,940$ 100$ <br />K Electrical Plans 6 1 13,900$ 15,210$ 100$ <br />L.1 Final Construction Documents 8 4 8 8 16 8,680$ 100$ <br />L.2 Technical Specifications 16 6 12 8 4 4 6 10,060$ 100$ <br />L.3 Final Opinion of Probable Cost 12 2 8 1 2 8 5,980$ 100$ <br />L.4 Plan Submittals, Approval Process, and Permitting 16 12 40 4 4 8 2 2 13,760$ 300$ <br />Optional Tasks / Construction <br />M.1 Bid Advertisement 8 8 3,320$ 150$ <br />M.2 Construction Administration 20 8 16 8 6 10,840$ 1,000$ <br />M.3 As Built Plans 4 16 2 4 8 5,540$ 250$ <br />Total (excluding optional tasks)272,855$ 3,950$ <br />Optional Task Environmental 58,900$ <br />Optional Task Skatepark 18,000$ <br />Optional Tasks (M.1 - M.3)19,700$ 1,400$ <br />Reimbursables included for budgetary purposes only. <br />Colored areas are not included in the total but are shown as optional. <br />Legend: <br />PM/LA=Project Manager Landscape Architect, LA/QA - Senior Landscape <br />Architect / Quality Assurance, SID=Senior Irrigation Designer, SLD=Senior <br />Landscape Designer, LCAD=Landscape CAD, PME= Project Manager <br />Engineering, CQA=Civil Quality Assurance, PE=Professional Engineer, <br />ENG=Engineer, HYDENG=Hydrology Engineer, CCORD=Civil Coordinator, <br />ADM=Administrative, SVY=Survey, GEO= Geotechnical Engineer, EE=Electrical <br />Engineer, SPOHN=Skatepark Designer, ENV=Environmental <br />Please note that scope and fee are negotiable. <br />City of Santa Ana <br />10th and Flower Park <br /> Project Fee Schedule <br />Task & <br />Description <br />  <br />  <br />City Council 17 – 75 5/2/2023