My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-05-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Agenda Packet_2023-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:08:31 PM
Creation date
4/26/2023 4:57:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana RFP 23-025 Page A1-1 <br />Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR PARKS & FACILITY ON-CALL ENGINEERING SERVICES <br />RFP NO. 23-025 <br />INTRODUCTION/BACKGROUND <br />The City of Santa Ana intends to retain Civil Engineering Consultants on an as-needed or "on- <br />call" basis. A Professional Services Agreement will be entered into with several of the qualified firms <br />Civil Engineering consultant(s) to provide professional services for a variety of projects on an on- <br />call basis. On an on-c all, as-needed basis, the selected firm(s) may later be asked to provide <br />professional engineering services proposals on specific, project-by-project basis, based on an <br />agreed-upon specific scope of services and fees. <br />In gene ral, work consists of general engineering design projects. Funding sources for each <br />project may vary for each project/task order assignment shall comply with the funding agency's <br />requirements. The projects may include water and sewer infrastructure design and rehabilitation <br />improvements, storm drain improvements; sidewalks, bike paths, curb and gutrer replacement; <br />slurry seal of residential streets; repair and overlay of asphalt concrete and/or PCC streets; <br />signing, striping, neighborhood traffic studies, traffic signal modifications; landscaping and <br />irrigation systems; park and recreational design., grant application writing, and other related <br />projects as required. O n occasion, environmental and planning support services may also be <br />requested. The City may need consultant services for mapping and legal description preparation, <br />construction management, staking and inspection. Occa sionally the City may also need <br />geotechnical, electrical, mechanical, structural, and other specific infrastructure related services. <br />The consultant shall be able to assist the City through this contract to provide the necessary <br />services. The consultant shall utilize in -house staff and/or sub-consultants to complete the <br />assignments to meet the City sta ndards. For specialized work for which the prime consultant <br />shall require 11 sub-consultant, the prime consultant shall serve as an administrative liaison <br />between the City and the snb-consultant. <br />P rime consultant mark-ups for sub-consultant work will not be allowed. <br />All proposals, plans, drawings, specifications, estimates, grant applications, and/or studies will <br />be subject to the final approval and satisfaction of the City of Santa Ana. <br /> <br /> <br />City Council 19 – 15 5/2/2023
The URL can be used to link to this page
Your browser does not support the video tag.