Laserfiche WebLink
Schedule of Fees <br />All field services charge <br />Regular Work Hours <br />First 8 hours, Monday through Friday, between 5:00 a.m. to 5:00 p.m. <br />Direct Project expenses outside services will be charged at Cost + 15%. <br />Time and One-Half <br />Any increment past first 8 hours through 12 hours, Monday through Friday <br />First 12 hours on Saturday <br />Shift between 3:00 a.m. and 5:00 a.m. <br />Double Time <br />Any hours past 12 hours Monday through Saturday, all day Sunday and Federal Holidays <br />Field Analysis <br />Code Item $/Unit Unit <br />G200 Soil Boring with Hollow Stem Auger Drilling Portal to Portal 415.00$ Hour <br />G201 Backfill Boreholes with Bentonite 26.00$ Foot <br />G202 Backfill Boreholes with Grout 37.00$ Foot <br />G203 Drumming and Disposal of Clean Cuttings 410.00$ Drum <br />G204 Fire Water Buffalo 578.00$ Day <br />G205 Support Truck 158.00$ Day <br />G206 Water Truck 473.00$ Day <br />G207 Mobilization and Demobilization for Rock coring 1,208.00$ Each <br />G208 Rock Coring 478.00$ Hour <br />G209 Decontamination of Vehicle and Equipment (Up to 100 miles)315.00$ Each <br />G210 Field Resistivity, up to 3 arrays, maximum distance of 40 ft.1,890.00$ Each <br />G211 Environmental Soil Boring with Hollow Stem Auger Portal to Portal 446.00$ Hour <br />G212 Environmental Soil Boring with Direct Push Portal to Portal 399.00$ Hour <br />G213 Environmental Groundwater Sampling with Grundfos, Portal to Portal 289.00$ Hour <br />G214 Environmental Analysis of soil for waste classification Quote/Sample <br />G215 Environmental Analysis of liquid for waste classification Quote/Sample <br />G216 Ground Resistance Tester (Four Point Method), plus travel 1,700.00$ Each <br />G217 Potholing, two-man crew 600.00$ Hour <br />Mix Design Review <br />Code Item $/Unit Unit <br />D250 Review of Concrete Mix Design 168.00$ Each <br />D251 Review of Grout Mix Design 168.00$ Each <br />D252 Review of Mortar Mix Design 168.00$ Each <br />D253 Review of Asphalt Mix Design 210.00$ Each <br />Sample Pick-Up/Hold <br />Code Item $/Unit Unit <br />All hold samples are charged at the same rate as the testing rate <br />U303 Technician for Specimen pick up, minimum 2 hours 120.00$ Hour <br />U304 Vehicle (Up to 100 miles)75.00$ Trip <br />Field Equipment Charges <br />Code Item $/Unit Unit <br />E350 Brass Mold 21.00$ Each <br />E351 Concrete Air Meter 53.00$ Day <br />E352 Concrete Unit Weight (Scale, Bucket, Rod and Mallet)32.00$ Day <br />E353 Field Vehicle Usage (Up to 100 miles)74.00$ Trip <br />E354 Concrete/Asphalt Coring Equipment rental (min 4 hrs and 8 hrs after)200.00$ Hour <br />E355 Fireproofing Adhesion/Cohesion 21.00$ Test <br />E356 Hand Auger Equipment 131.00$ Day <br />E357 Level D Personal Protective Equipment (PPE), per person 42.00$ Day  <br />  <br />City Council 19 – 26 5/2/2023