Laserfiche WebLink
AP), U.S. Green <br />Building Council <br />MEMBERSHIPS I <br />AFFILIATIONS <br />Functional Safety (FS) <br />Eng (TUV Rheinland): <br />#8378114; exp. April <br />2024 <br />Stephen M. Diamond, P.E., BCEE <br />PFAS Groundwater Treatment Project (N-Wells) and Well Q2 Perchlorate Removal Facility, <br />Santa Clarity Valley Water Agency, SANTA CLARITA, CA I Project Manager <br />Managed the Final Design and Construction phases of a PFAS Treatment Facility for the <br />SCVWA's N-Wells with a treatment capacity of 6,000-gpm. The N-Wells PFAS Treatment facility <br />includes an ion exchange treatment system consisting of three lead -lag IX trains with PFAS <br />selective resin designed to treat 2,000-gpm each, and three high -rate cartridge filters with 12, 6- <br />inch diameter filter elements each. The final design also included the 1,200 gpm Well Q2 <br />perchlorate removal facility which consisted of one lead -lag IX train with Perchlorate selective <br />resin. Project delivery included pre -purchasing long -lead items such as the IX Systems and pre - <br />filters, pre -selecting OSHGS and chemical systems, Agency self -performing some work for the <br />Q2 site, and pre -purchasing the IX resin. <br />Valley Center Well PFAS Removal Facility Planning and Preliminary Design, Santa Clarita <br />Valley Water Agency, Santa Clarita, CA I Project Manager <br />Managed the Planning and Preliminary Design of a PFAS Treatment Facility for the SCVWA's <br />Valley Center Well with a treatment capacity of 1,200-gpm. Planning included an evaluation of <br />treatment alternatives (including GAC, IX and a hybrid GACAX), development of conceptual <br />design, and the development of a preliminary design based on IX treatment for PFAS removal. <br />Valley Center Well PFAS Groundwater Treatment Improvements, Santa Clarity Valley Water <br />Agency, Santa Clarita, CA I Project Manager <br />Managed the Design of a PFAS Treatment Facility for the SCVWA's Valley Center Well with a <br />treatment capacity of 1,200-GPM. Planning included an evaluation of treatment alternatives <br />(including GAC, IX and a hybrid GACIIX), development of conceptual design, and the <br />development of a preliminary design based on IX treatment for PFAS removal. Final design <br />included the IX treatment system, pre -purchasing long -lead items such as the IX Vessels and <br />pre -filters, and the design of a new chloramination facility and site improvements. <br />Well No. 41 Wellhead Treatment Project, Ontario Municipal Utilities Company, Ontario, CA <br />Civil Engineer <br />Engineering services during construction for the Well No. 41 Wellhead Treatment Project. The <br />project includes a 2,350 gpm ion exchange perchlorate treatment facility, new chlorine building <br />for on -site generation of sodium hypochlorite (relocation of existing OSG system from Well No. <br />41 building), associated site improvements, approximately 1,300 LF of 16-inch diameter <br />CML&C groundwater supply pipeline, 200 LF of 16-inch diameter CML&C treated water <br />pipeline, and 300 LF of 18-inch diameter RCP storm drain. <br />Perris North Basin Groundwater Program, Eastern Municipal Water District, Perris, CA <br />Project Manager <br />Managed the preliminary design for three separate groundwater treatment sites in the Perris <br />North Basin. Designed a centralized treatment facility to treat 1,240 gpm of groundwater from <br />two (2) wells for the Moreno Valley Area that included GAC for PCE removal, single -use IX for <br />perchlorate removal and staggered bed IX for nitrate removal. Designed chemical feed systems <br />to provide a chloramine residual disinfectant, and well equipping/wellheads, and a product water <br />pump stationlelearwell. Designed a 2,300 gpm centralized treatment facility for the Cactus <br />Corridor, including GAC for PCE removal, and a 650 gpm GAC treatment facility for the South <br />Area Well 204. <br />