My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL <br />EEC Environmental Fee Schedule <br />PERSONNELCHARGES <br />The charge for all time required for the performance of <br />the Scope of Work, including office, field and travel <br />time, will be billed at the hourly rate according to the <br />labor classifications set forth below: <br />Labor Classification Hourly Rate <br />Jr. Staff Engineer/Geologist/Scientist <br />$130 <br />Staff Engineer/Geologist/Scientist <br />$160 <br />Sr Staff Engineer/Geologist/Scientist <br />$175 <br />Project Engineer/Geologist/Scientist -1 <br />$200 <br />Project Engineer/Geologist/Scientist -11 <br />$210 <br />Sr Project Engineer/Geologist/Scientist -1 <br />$230 <br />Sr Project Engineer/Geologist/Scientist - II <br />$250 <br />Principal Geologist <br />$275 <br />Principal <br />$275 <br />Project Assistant <br />$120 <br />Technician <br />$125 <br />Drafter <br />$140 <br />Sr Technician <br />$145 <br />Compliance Inspector <br />$145 <br />Technician GIS/Technology <br />$120 <br />Analyst GIS/Technology <br />$135 <br />Sr Analyst GIS/Technology <br />$150 <br />Specialist GIS/Technology <br />$160 <br />Sr Specialist GIS/Technology <br />$170 <br />Supervisor GIS/Technology <br />$185 <br />Director/GIS Technology <br />$200 <br />Construction Technician <br />$105 <br />Construction Field Supervisor <br />$125 <br />Construction Manager <br />$130 <br />Sr Construction Manager <br />$165 <br />Technical Editor <br />$125 <br />Emergency response will be charged at a rate of 1.5 <br />times the standard hourly rate. <br />When EEC Staff appear as expert witnesses at court <br />trials, mediation, arbitration hearings and depositions, <br />their time will be charged at 2.0 times the standard rate. <br />All time spent preparing for such trials, hearings, and <br />depositions, will be charged at the standard hourly rate. <br />Travel <br />Vehicles used on project assignments will be <br />charged at $75 per day. Mileage is billed at the <br />current rate established by the Internal Revenue <br />Service plus mark up. Per Diem is billed at a unit <br />cost of $75 per day (except in high cost markets, <br />which will adhere to GSA rates). Airfare, lodging, <br />rental cars and associated expenses are billed at <br />cost plus 15%. <br />Field Equipment <br />Field Equipment is billed at standard unit costs. <br />Rate schedules are available upon request. <br />Subcontractors and Reimbursables <br />The costs of subcontractors, materials, equipment <br />rental and costs incurred will be charged at cost <br />plus 15%. <br />Other Proiect Charges <br />The cost of additional report reproduction and <br />special project accounting will be billed as <br />appropriate. Plotting plans are charged by size, <br />black and white or color, and by the number of <br />copies supplied. <br />Shipping and Postaae <br />Shipping charges include couriers and the postage <br />necessary will be charged at cost plus 15%. <br />Interest Charges <br />Interest on late payments will be charged at the rate <br />of 1.5% per month. <br />Payment Terms <br />Net 30 days apply to all work performed and <br />invoiced unless superseded by a specific executed <br />contract. <br />This Fee Schedule is adjusted each subsequent year to reflect the economic changes for the new year. The new schedule will apply to existing <br />and new assignments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.