My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PFAS TREATMENT SYSTEMS <br />The Consultant shall provide cost estimates for the treatment facility equipment, any <br />necessary land acquisition to accommodate a treatment system(s), permitting, plumbing <br />connections, transmission alignments and system integration. The Consultant shall also <br />include capital, maintenance and operation cost estimates for IX treatment system(s). <br />F. PRELIMINARY SCHEDULE <br />The Consultant shall develop a preliminary phasing schedule for construction in the <br />Planning Study. The plan is intended to provide the City a schedule and projected annual <br />outlays for financial planning. In the preliminary schedule, the Consultant shall include the <br />anticipated duration of construction as well as any necessary utility extensions required. <br />G. FINAL REPORT <br />The final report shall include discussion of all items listed herein and shall be submitted <br />to the City for review and comments. The Consultant shall provide a PDF digital copy of <br />the preliminary report and shall incorporate all comments made by the City prior to <br />submitting of the final report. <br />In addition to the aforementioned items, the final report shall also include one or more <br />sections summarizing major findings, any significant challenges or common themes <br />relevant to the City's system, and recommend any future actions by the City as next steps <br />towards PFAS treatment implementation. The report shall contain descriptions of <br />operation and maintenance such as IX resin frequency of change out, equipment details, <br />sample/analysis frequency, and what staff augmentation/certification is required. <br />2. DESIGN PHASES <br />Once the Planning Study has been completed, the Consultant shall provide design services <br />including preparation of design sheets, specifications and permitting. All submittals described <br />herein shall be provided in the form of a PDF digital copy (full-size). The design phases shall <br />Include, but are not limited to the following items: <br />A. DRAFT DESIGN REPORT (10% DESIGN SUBMITTAL) <br />The Contractor is required to create a Preliminary Design Report (PDR) based on the <br />Planning Study for each treatment site requested by the City. The PDR shall be considered <br />a 10% design level package for the project in which the IX wellhead treatment project goals <br />and design criteria are addressed with alternatives, analysis and potential risks. <br />B. FINAL DESIGN REPORT (30% DESIGN SUBMITTAL) <br />After the City defines the major design elements of the project and refines the project's <br />scope, schedule and budget expressed in the preliminary design report, the Consultant shall <br />develop the Final Design Report. The Final Design Report shall be considered a 30% design <br />City of Santa Ana RFP 22-133 <br />On -Call Engineering Design Services for PFAS Treatment Systems <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.