Laserfiche WebLink
identifying exactly what inpuUoutput was terminated in <br />each PLC and where all the wiring within each PLC <br />cabinet originated from and terminated at, as well as <br />assessing the existing fiber optic network to <br />determine the necessary steps to connect all the new <br />PLCs to the fiber optic network through ethernet. <br />The estimated construction cost for the project is <br />$2,6 million, <br />Regional Treatment Plant Miscellaneous <br />Improvements 2017 Final Design* I South <br />Orange County Wastewater Authority <br />Laguna Niguel, California I Associate Engineer <br />Cole produced specifications and drawings for the <br />replacement of Dissolved Air Flotation pressurization <br />piping and equipment, polymer mixing and metering <br />equipment, progressive cavity scums pumps, primary <br />scum collection troughs and skimmers, Primary <br />Gallery ventilation equipment and ducting, <br />instrumentation upgrades, and electrical upgrades, <br />He performed preliminary pump sizing and selection <br />for centrifugal DAF pressurization pumps, preliminary <br />pump sizing and selection of primary scum pumps, <br />static pressure calculations for supply and exhaust <br />ventilation, as well as evaluated the classification of <br />the Primary Pump Gallery per the NFPA 820. Built in <br />1982, the Plant had identified this equipment as <br />needing replacement and/or improvements. The <br />estimated construction cost for the Plant's <br />miscellaneous improvements was $3 million. <br />42-Inch Phase 4 & 5 Magic Mountain Pipeline <br />Extension* I Santa Clarita Valley Water Agency <br />Santa Clarita, California I Project Engineer <br />Cole designed 5,500 linear feet of 42" potable water <br />main, the isolation valve vaults mechanical layout, <br />client correspondence, DDW crossings exception <br />permit applications, specification preparation, drawing <br />preparation, and construction cost estimates for this <br />project. He performed calculations to determine the <br />minimum steel cylinder thickness requirements, blow - <br />off requirements, and air -vac requirements. The <br />scope of this project included design services for the <br />42-inch potable water main, isolation valve vaults, <br />vault electrical and instrumentation, a 24" and 30" <br />lateral for future emergency connections, and <br />cathodic test stations. The pipeline extension <br />consisted of approximately 5,500 linear feet of 42" <br />welded steel pipe CML&C, 200 linear feet of 24" <br />welded steel pipe CML&C, 200 linear feet of 30" <br />welded steel pipe CML&C, two 18 feet deep cast -in - <br />place 20 feet by 11 feet concrete isolation valve <br />vaults, one 18 feet deep 20 foot by 20 foot isolation <br />valve vault, one precast isolation valve vault, and 60 <br />utility crossings along Magic Mountain Parkway. The <br />total construction cost for the pipeline extension was <br />$6 million. <br />Peck Reservoir Roof Seismic Evaluation and <br />Replacement* I City of Huntington Beach <br />Huntington Beach, California I Associate Engineer <br />Cole generated construction cost estimates for three <br />roofing alternatives, performing a net present value <br />analysis of each alternative over an 80-year life cycle, <br />organizing the calculations and analyses of the <br />structural team, and writing the technical <br />memorandum. <br />Wastewater Pumping Plant Emergency Generator <br />Replacement Project I Wastewater Collection <br />Engineering Division, Bureau of Engineering, <br />City of Los Angeles I Los Angeles, California <br />Associate Engineer <br />Cole prepared submittals and RFIs for the <br />replacement of 10 emergency generators and <br />automatic transfer switches (ATS) at eight pumping <br />plants 1632, 638, 648, 654, 616, and North & <br />West Yards). The generator size varies from 100 to <br />800 kW. The Ballona Creek Pumping Plant (PP654) <br />is equipped with two 800 kW generators. Total <br />estimated construction cost is $5 million, PP654 has <br />two skid -mounted generators inside the building <br />which will be replaced with associated cabling <br />interface, ATSs, load banks, batteries, and fuel <br />systems. The PP654 cooling system is on the building <br />roof that must be removed after disassembly and the <br />new generators components placed. <br />Treatment Plant Switchgear Replacement Project <br />Delta Diablo I Antioch, California I Associate Engineer <br />Cole sized the new rooftop HVAC unit and produced <br />related design documents, He performed cooling load <br />calculations for the main switchgear room and <br />coordinated with our structural department to make <br />structural accommodations for the additional roof <br />loads. <br />"denotes projects completed with other firms <br />City of Santa AnaOn-Ca II Engineering Design Services for PFAS Treatment Systems RFP NO. 22�133 A-12 <br />