My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
treatment facility. As project engineer, Sean provided <br />project coordination, on -time delivery of project <br />deliverables, and coordination of services through <br />project completion. As mechanical engineer, he <br />designed a dry -media chlorine scrubbing system to <br />replace an existing wet chlorine scrubber that <br />included forced air systems, ventilation, and <br />emergency containment systems for a chlorine <br />storage facility. <br />Jamieson Canyon Water Treatment Plant <br />Improvements* I City of Napa I Napa, California <br />Mechanical Engineer/Construction Coordinator <br />This $38 million project expanded an existing water <br />treatment plant. Sean engineered plant water and <br />emergency fire pump stations, building mechanical <br />and plumbing systems, laboratory facilities, and <br />process facilities for ozone treatment. He was the <br />lead coordinator of the engineering services provided <br />during construction, including cross -discipline <br />coordination, shop drawing, RFI review, and record <br />drawing production. <br />Avenue Water Treatment Plant Membrane Upgrade* <br />City of Ventura I Ventura, California <br />Construction Coordinator <br />Sean performed mechanical engineering design and <br />coordinated the engineering services during the <br />construction of a 22-million-membrane treatment <br />upgrade with 10 MGD capacity. He engineered <br />chemical storage and delivery systems, pumping, and <br />process mechanical piping systems. As construction <br />coordinator, he managed shop drawing and RFI <br />review and performed day-to-day coordination with <br />the Contractor and the City's Construction Manager. <br />Chambers Creek Regional Wastewater Treatment <br />Plant Expansion" I Pierce County I Tacoma, <br />Washington I Lead Mechanical Engineer <br />With a forecasted population growth increase, the <br />Chamber's Creek Regional Wastewater Treatment <br />Plant (45-MGD) expansion added 50% more <br />capacity. As lead mechanical engineer, Sean <br />performed mechanical engineering for process and <br />non -process areas, including ventilation and other <br />utility services for process mechanical wastewater <br />equipment. <br />Orange Cove Wastewater Treatment Plant* I City of <br />Orange Cove I Orange Cove, California I Mechanical <br />Engineer <br />Sean performed process and building mechanical <br />engineering, including aeration systems, solids <br />handling, chemical dosing, and building mechanical <br />engineering for process and non -process facilities, <br />This project was completed while Sean was <br />mechanical Engineer at Kennedy/Jenks Consultants, <br />`denotes projects completed with other rims <br />City of Santa Ana I On -Call Engineering Design Services for PEAS Treatment Systems RFP 110. 22-133 A22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.