My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 10:06:30 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
5/1/2026
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />A TETRA TECH COMPANY <br />Matt Avila, PMP <br />City of Newport Beach Annual Support Contract <br />Project Manager of a 5-year Professional Services Agreement to the City of Newport Beach. <br />Established City pain -points and developed multi -year SCADA improvement plan, reducing City <br />outages, operating costs and improving SCADA system reliability. <br />Amazon Multiple Projects <br />With a previous employer, Program Manager of $25M+ annual budget across 6 key initiatives, <br />improving end -to -end warehouse logistics within the customer enterprise. Developed projects from <br />Alpha concept, through Beta testing to mass production of machines within defined DEE and cost - <br />analysis parameters. Designed, built and tested multiple independent machines from a <br />mechanical, electrical and controls perspective. <br />• Corning Connector Assembly System <br />With a previous employer, Project Manager of a $2M budget to develop, design, build and test a <br />fully automated connector assembly machine validating 16 key characteristics per part. Capable <br />of producing 150 parts/min with a <3% scrap rate, replacing a previously manual process. <br />Work Experience <br />• Enterprise Automation, Remote, Project Manager Jan 2020 — Present <br />• JR Automation, Holland, Ml, Project/Program Manager Nov 2017 — December 2019 <br />• United States Air Force, multiple locations, Officer May 2011 —Nov 2017 <br />• United States Air Force, multiple locations, Enlisted Sep 2005 — Jun 2007 <br />ENTERPRISE AUTOMATION • 210 GODDARD • IRVINE, CA • 92618 <br />PHONE (949) 769-6000 • W W W.EAINTEGRATOR.COM <br />City of Santa Ana On -Call Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 A-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.