My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (8)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:48:46 PM
Creation date
5/3/2023 3:21:29 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2023-053-01
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSALFOR <br />On -Call Engineering Design Services <br />PFAS Treatment Systems <br />Existing Condition 2,454 256 285 <br />(No PFAS) <br />Proposed IX Treatment with Clean 2,454 302 328 <br />Filters <br />Proposed IX Treatment with Dirty 2,454 317 343 <br />Filters <br />A system curve for Well 26 with PFAS treatment is presented in Figure 1. The existing well pump curve is not <br />provided at this time, therefore a generic curve is included to indicate a pump curve that would be capable of <br />incorporating treatment. During the design process Tetra Tech will evaluate all of the actual existing well pump <br />curves against the calculated new system curve to determine the well pump's ability to meet the new system <br />pressure requirements with PFAS treatment. The maximum flow rate the pump will operate at with the new <br />treatment will be presented, and if unacceptable recommendations made for modifications such as adding <br />bowls, changing motor size, or replacing the well pump entirely. <br />cico = at sc <br />Figure 1. Preliminary system <br />curve for Well 26 and <br />example pump curve. <br />note: actual pump curve not <br />available, shown is an example <br />for demonstrative purposes. <br />Figure 2. Example lead lag <br />model for use to establish <br />increased monitoring and <br />resin change -out <br />frequency requirements. <br />TETRA TECH Page 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.