My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (8)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:48:46 PM
Creation date
5/3/2023 3:21:29 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2023-053-01
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSALFOR <br />On -Call Engineering Design Services HAS Treatment Systems <br />RELEVANT PROJECT EXPERIENCE <br />In this section we have included a list of relevant PFAS Projects. The design of each project was completed in <br />the last five years for a local Public Agency. <br />Serrano Water District I C.L. "Larry" Pharris Jr. Filtration Plant <br />Owner: Serrano Water District <br />Number of Wells: 2 <br />Capacity: 3,000 GPM <br />Status: Operational since February 2022 <br />Construction Costs: $3.8 million <br />PFAS Treatment: Ion Exchange <br />Reference: Benjamin Smith, PE, Orange County Water District <br />(714) 378-3211 <br />Project Benefits: <br />• Online within one year of construction start <br />• Fully utilizes local groundwater <br />• Designed partially below grade to soften the view of neighbors <br />• Second project placed into service by OCWD PFAS program <br />• Winner of ASCE Orange County Branch Water Treatment Project of the Year 2020 <br />City of Fullerton I Kimberly Well 1A Water Treatment Plant <br />Owner: City of Fullerton <br />Number of Wells: 1 <br />Capacity: 3,200 GPM <br />Status: Operational since June 2021 <br />Construction Costs: $1.7 million <br />PFAS Treatment: Ion Exchange <br />Reference: Benjamin Smith, PE, Orange County Water District <br />(714) 378-3211 <br />Project Benefits: <br />• Constructed on extremely small site <br />• Upgrades to well, pump, motor and VFD added to project <br />• First Orange County Project to obtain a Division of Drinking Water Permit <br />• First project placed into service by OCWD PFAS program <br />City of Fullerton I Main Plant Water Treatment Plant <br />Owner: City of Fullerton <br />Number of Wells: 5 <br />Capacity: 9,400 GPM <br />Status: Design Completed & Under Construction <br />Construction Costs: $11.3 million <br />PFAS Treatment: Granular Activated Carbon <br />Reference: Ryan Bouley, PE, Orange County Water District <br />(714)378-8207 <br />Project Benefits: <br />• GAC used due to presence of VOCs & PFAS in the groundwater <br />• Designed to be built within existing operating City Water Plant <br />• Layout included planning for future expansion <br />• 3D renderings used to provide visual view of the completed site during CEQA process <br />TETRA TECH Page 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.