Laserfiche WebLink
City of Santa Ana - Well N26 PFAS IX Treatment Plant <br />OTETRATECH Drawing Sheet Count <br />30%Oesi n <br />30%Design <br />W%Design <br />90%Desi n <br />300%Oast n <br />Sequential <br />Number <br />Subset <br />Count <br />Sheet <br />Number <br />Description <br />Planned <br />Planned <br />Planned <br />Planned <br />Planned <br />General <br />1 <br />1 <br />G-000 <br />Title Sheet <br />10% <br />3" <br />60% <br />90% <br />100% <br />2 <br />2 <br />G-001 <br />Sheet Index, Vicinity Map &Location Map <br />1016 <br />30% <br />W% <br />EMS <br />100% <br />3 <br />3 <br />G-002 <br />General Notes and Erosion Control Notes <br />9m% <br />100% <br />4 <br />4 <br />G-003 <br />Standard Drawing; Symbols, Abbreviations, & Survey Data <br />60% <br />9" <br />100% <br />5 <br />5 <br />G-004 <br />Process Flow Diagram <br />10% <br />30% <br />60% <br />90% <br />100% <br />6 <br />6 <br />G-005 <br />Horizontal Central Plan <br />90% <br />300% <br />Civil <br />2 <br />1 <br />C-101 <br />Site Demolition Plan <br />10% <br />3" <br />60% <br />90% <br />Sao% <br />8 <br />2 <br />C-102 <br />Demolition Details 1 <br />60% <br />90% <br />100% <br />9 <br />3 <br />C-103 <br />Demolition Details 2 <br />W% <br />90% <br />10" <br />30 <br />4 <br />C-104 <br />Proposed Site Plan <br />10% <br />3" <br />60% <br />90% <br />100% <br />11 <br />5 <br />C-105 <br />Yard Piping Plan <br />10% <br />30% <br />60% <br />9" <br />100% <br />12 <br />6 <br />C-301 <br />Yard Piping Profiles <br />90% <br />100% <br />13 <br />) <br />C-501 <br />Civil Details <br />60% <br />90% <br />300% <br />14 <br />8 <br />C-502 <br />Civil Details 2 <br />W% <br />100% <br />15 <br />9 <br />C-503 <br />Civil Details 3 <br />90% <br />100% <br />16 <br />10 <br />C-504 <br />Connection Details <br />W% <br />90% <br />10" <br />12 <br />11 <br />C-505 <br />Connection Detalls <br />60% <br />90% <br />100% <br />Structural <br />18 <br />1 <br />5-001 <br />General Structural Notes <br />10% <br />30% <br />60% <br />90% <br />100% <br />19 <br />2 <br />5-00 <br />Special Inspection & Structural Observations <br />60% <br />90% <br />100% <br />20 <br />3 <br />5-101 <br />Foundation Plan <br />10% <br />30% <br />6W <br />90% <br />100% <br />21 <br />4 <br />5-301 <br />Sections <br />50% <br />90% <br />S00% <br />22 <br />5 <br />5-501 <br />Structural Details 1 <br />90% <br />IN% <br />23 <br />6 <br />5-502 <br />Structural Details 2 <br />90% <br />100% <br />24 <br />] <br />5-303 <br />Structural Details 3 <br />90% <br />100% <br />Mechanical/Process <br />25 <br />1 <br />0-100 <br />Overall Process Plan <br />10% <br />305A <br />60% <br />90% <br />100% <br />26 <br />2 <br />0-101 <br />Pump Modifications Plan &Section <br />60% <br />90% <br />IN% <br />27 <br />3 <br />0-103 <br />PFAS Vessel Process Pip n <br />10% <br />30% <br />60% <br />90% <br />200% <br />28 <br />4 <br />D-104 <br />Pretreatment Process Plan <br />60% <br />90% <br />IN% <br />29 <br />5 <br />D-105 <br />Boaster Pumps Plan <br />10% <br />MI. <br />60% <br />90% <br />100% <br />30 <br />6 <br />D-106 <br />Sand Separator <br />31 <br />] <br />D-301 <br />PFAS Vessel Process Sections <br />10% <br />30% <br />60% <br />90% <br />IN% <br />32 <br />8 <br />D-302 <br />PFAS Vessel Process Sections <br />90% <br />I00% <br />33 <br />9 <br />D-303 <br />Booster Pump Sections <br />60% <br />90% <br />100% <br />34 <br />10 <br />D-304 <br />Process Piping Sections <br />60% <br />90% <br />IN% <br />35 <br />it <br />D-501 <br />Process Details l <br />90% <br />I00% <br />36 <br />12 <br />D-502 <br />Process Details 2 <br />90% <br />I00% <br />32 <br />13 <br />D-901 <br />Treatment Plant 3D Perspective <br />90% <br />100% <br />Electrical <br />38 <br />1 <br />E-001 <br />Electrica l Symbols, Notes & Abbreviations <br />1" <br />30% <br />60% <br />90% <br />100% <br />39 <br />2 <br />E-101 <br />Electrical Site Demolition Plan <br />601% <br />90% <br />100% <br />40 <br />3 <br />E-103 <br />Electrical Overall Site Plan <br />IM <br />30% <br />60% <br />90% <br />100% <br />41 <br />4 <br />E-104 <br />Vessels Electrical Plan <br />60% <br />90% <br />100% <br />42 <br />5 <br />E-105 <br />Emergency Generator <br />10% <br />30% <br />43 <br />6 <br />E-201 <br />Panel& Cond Pit Schedule <br />W% <br />90% <br />100% <br />44 <br />2 <br />E-202 <br />Panel& Cond uit Schad ule <br />90% <br />100% <br />45 <br />8 <br />E-501 <br />Electrical Details <br />60% <br />90% <br />100% <br />46 <br />9 <br />E-502 <br />Electrical Details <br />90% <br />100% <br />Instrumentation <br />42 <br />1 <br />1-001 <br />P&IDSymbols&Abbreviations <br />10% <br />30% <br />60% <br />90% <br />IN% <br />49 <br />2 <br />1-101 <br />P&M Pretreatment & Sand Separator <br />10% <br />30% <br />60% <br />90% <br />100% <br />49 <br />3 <br />-1@ <br />P&ID PI:Treatment <br />10% <br />30% <br />60% <br />90% <br />100% <br />50 <br />4 <br />1-f03 <br />P&IO Booster Pumps <br />10% <br />30% <br />60% <br />90% <br />I00% <br />51 <br />5 <br />1-104 <br />P&IDChemical Facilities <br />60% <br />90% <br />IDO% <br />52 <br />6 <br />1-105 <br />P&IDEffluent Modifications <br />W% <br />90% <br />100% <br />Traffic Control <br />Plans <br />53 <br />1-001 <br />Traffic Control Notes <br />90% <br />100% <br />54 <br />2 <br />1-101 <br />Traffic Control Plan 1 <br />90% <br />IDO% <br />55 <br />3 <br />1-102 <br />Traffic Control Plan 2 <br />90 <br />1 100% <br />Total Drawing Count 19 19 36 53 53 <br />