My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HCI SYSTEMS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HCI SYSTEMS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 8:40:43 AM
Creation date
5/9/2023 4:31:54 PM
Metadata
Fields
Template:
Contracts
Company Name
HCI SYSTEMS, INC.
Contract #
A-2023-078
Agency
Police
Council Approval Date
5/2/2023
Expiration Date
6/30/2026
Insurance Exp Date
3/2/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c-1i <br />Fire Safery•System Integrstors <br />Date: September 16, 2022 <br />Job Site: Santa Ana PD & Jail <br />60 Civic Center <br />Santa Ana, CA <br />FACP: EST <br />From: Lauren Reyes <br />949415-9621 <br />Ontario • San Diego • Irvine • Pasadena • Fresno <br />Sacramento • Pleasanton <br />Telephone: (877)331-2084•Fax: (909)628-7774 <br />DIR#1000000046 <br />To: Paul Bui <br />Phone: 714-240-2534 <br />Email: pbui(u)a Santa-ana.org <br />HCI Systems Inc. is pleased to present this proposal to perform the Five Year Inspection on the fire sprinkler systems <br />located at the above referenced address. The scope of work performed during these tests is in compliance with the <br />new State Fire Marshal's requirements, set forth in NFPA 25. The scope of work to be completed is as follows: <br />FIVE YEAR FIRE SPRINKLER & STANDPIPE SYSTEM TESTING <br />• A thorough physical inspection of sprinklers, valves, components, devices, piping, hangers, and assemblies. This <br />includes a thorough walk through and visual inspection of the sprinkler heads in the building. <br />• Main drain flow test. <br />• Perform required roof flow test of standpipe systems utilising roof manifolds including dry standpipe and fire hose <br />systems. <br />• Examination of sprinkler piping and seismic bracing above concealed spaces/ceilings for acceptable conditions in <br />areas that are accessible. This includes a visual inspection above the ceiling filesihard lid to verify proper bracing <br />(spot verification). Be advised that we will pop ceiling tiles in various locations as well as inspect above the hard lid <br />areas where access hatches are available (spot verification). <br />• Back flush of the fire department connections (FDC) serving the sprinkler systems. This will require locating and <br />accessing the check valves for the FDC's in order to perform a proper backf ush of the Fire Department Connections. <br />• Exercise and operation of all sectional and system control valves, and lubrication as needed. <br />• Exercise and lubricate all hose valve outlets in stairwells. <br />V 072622, Quoted 9/16/22 Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.