Laserfiche WebLink
X Engineering prepared construction documents for the design of approximately 2700 linear feet of an 18" <br />domestic water line beneath a partially constructed roadway, Chino Avenue. The design included removal of <br />an existing 16" domestic water line and replacement with an 18" line. Additionally, removal of a connection <br />between the existing water line and a separate domestic water line within a different pressure zone was <br />required. The project team coordinated closely with the Ontario Municipal Utility Company (OMUC) to ensure <br />minimal water shut offs and to provide design solutions that would allow for future extension. <br />X Engineering prepared the design for two additional water lines within Chino Avenue which include a 12" <br />domestic water line and an 8" recycled water line. An alternative alignment study was also prepared and will <br />be presented to OMUC in an effort to find a feasible alignment for the two water lines. The preferred alignment <br />will minimize and avoid impacts to existing physical structures, eliminate the need for excess right-of-way <br />acquisition, and maintain compliance with the Division of Drinking Water requirements. <br />EX. R/W <br />EX <br />R/W <br />FUTURF <br />R/W <br />88' <br />44' <br />44' <br />FUTURE <br />FINISHED SURFACE <br />EX. GROUND <br />FX, FINISHED SURFACE <br />BY <br />OTHERS <br />EX. WALL <br />12' <br />32' <br />1 <br />1 32' <br />12' <br />10' <br />Fop <br />5' 7' <br />+ <br />El 8' 6, <br />Z <br />12' 6 <br />6 <br />14 <br />SWLTK <br />2% <br />4C, <br />27 <br />27 <br />27 IL <br />X =allc G— 4 <br />4,8�5' <br />SEEM —FUTURF <br />19", <br />C&G <br />EX. 12" DW <br />E X 1 <br />X. 16��DIN <br />8.25' <br />712.88' <br />TO BE REMOVED <br />FUTURE 16" PW <br />FROP 18" DW <br />8.38' <br />BY OTHERS <br />FUTURE 8" PW <br />EX <br />72" SD <br />BY OTHERS <br />CHINO <br />SCALE <br />AVENUE <br />1`10' <br />FROM <br />STA 232+67.59 TO STA +247+9246 <br />Underground wet utilities cross section in Chino Avenue <br />REFERENCE <br />AGENCY <br />City of Ontario, Engineering Department - Ontario Municipal Utility Company <br />DATES OF SERVICE <br />June 2019 - June 2020 <br />CONTACT <br />Jeff Krizek I Associate Engineer, Ontario Municipal Utility Company, 909.395.2697 <br />City Council <br />20-546 X ENGINEERING 51WRMNG, INC. 14 <br />