My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMA GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RMA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 11:04:42 AM
Creation date
5/18/2023 2:14:42 PM
Metadata
Fields
Template:
Contracts
Company Name
RMA GROUP, INC.
Contract #
A-2023-064-03
Agency
Public Works
Council Approval Date
4/18/2023
Expiration Date
7/5/2024
Insurance Exp Date
3/1/2025
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERSTANDING OF NEED <br />permits and mitigation measures are in compliance <br />with project documents. <br />Subtask D: Along with special inspections, the <br />project will require material testing. Inspectors will <br />ensure accurate samples are taken in accordance <br />with project documents. The material samples will be <br />transported to our certified laboratory and assigned a <br />project specific bar code for tracking and controlling <br />purposes. According to the RFP, material testing is <br />required for concrete, masonry, asphalt, soils, base <br />materials, reinforcing steel, fireproofing, environmental <br />and non-destructive testing on paint coatings (on - <br />site and fabrication shop). Once material testing is <br />completed, the test results will be provided to the City <br />representative and contractor. <br />RMA GROUP'S SUGGESTIONS TO ENHANCE <br />THE CITY'S OBJECTIVES <br />RMA Group's inspectors and staff are cross -trained <br />and hold multiple certifications. This allows our staff <br />to dispatch an inspector who is experienced, multi - <br />disciplined, and capable of performing multiple tasks. <br />As a result, we are able to reduce the overall inspection <br />hours resulting in cost and time savings for the City. <br />Additionally, our inspection staff is highly experienced <br />in projects with similar scopes. They utilize their <br />experience to not only verify code compliance but also <br />to assist in anticipating forth coming issues, so that <br />they can be handled in a proactive fashion. <br />PROCESSANDAPPROACH <br />Our process utilizes an effective and detailed <br />management organization and state-of-the-art project <br />controls to ensure open and timely communication <br />between the City of Santa Ana, its representatives, <br />RMA Group, and our staff. Our approach will expedite <br />the timely response for service requests and will <br />manage the prompt reporting of all deliverables while <br />delivering a strict budget management practice to <br />complete the City's project with a high <br />level of cost-effectiveness. <br />Our staff will be readily available to accommodate last- <br />minute requests for testing and inspection services in <br />the field and / or our laboratory. <br />With our laboratory capabilities and large staff of <br />engineers, RMA Group has the proven ability to <br />rapidly respond to the City's requests, complete the <br />requested materials testing and inspection services, <br />and furnish complete reports within strict timetables. <br />We are and will remain available to commence <br />work on your project within 12-hours of notification <br />by authorized City personnel and in an emergency <br />situation can accommodate a request within two to <br />four hours. <br />Additionally, we will maintain an emergency contact <br />list so City personnel will always know who to call in <br />emergency situations. Our depth of knowledgeable <br />personnel together with our dedication to the City's <br />project, make us the ideal candidate for providing the <br />as -needed testing and inspection services. <br />Our professional staff will actively coordinate our <br />services with the City's representatives and / or <br />Inspector regarding scheduling requests, testing <br />turnaround times, results, and interpretations of <br />results. The results of all tests will be reported in the <br />appropriate procedure for the City and will be properly <br />documented and filed in accordance with best industry <br />practice. RMA Group will provide services inclusive of <br />all elements necessary for a turn -key program. <br />PROJECT COORDINATION <br />Mr. Ray Roblero, our Project Manager, will be involved <br />during the project start up. Information obtained from <br />the City, during the initial notification call and our <br />subsequent communication with the City's Inspector <br />will be used to properly staff the project and keep <br />track of the anticipated budget utilization. During and <br />immediately following the initial notification, we will <br />gather information with regards to: <br />Anticipated scheduling and staffing requirements. <br />Key construction elements schedules and critical <br />deadlines. <br />Roles, responsibilities and contact information of <br />project team members. <br />Unique requirements or aspects of the project. <br />Any modifications to the Operational Procedures <br />contained in the Request for Proposals. <br />The information taken from the initial notification call will <br />be used to develop final schedules for deliverables that <br />clearly reflect all of the project requirements and the City's <br />RMA Group RFP NO: 20.111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES <br />Ewgpgjert Maltealw .rma paniessam CITY OF SANTA ANA 20-1600-P I SEPTEMBER 30, 2020 1 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.