Laserfiche WebLink
RELEVANT PROJECT EXPERIENCE <br />FOX STREET TANK PROJECT I PERRIS, CA <br />Owner: Eastern Municipal Water District (EMWD) <br />Contact: Fermin Balvaneda 1951.928.3777 <br />Project Status: 2016 - 2019 <br />Construction Cost:$3.5 Million <br />Part of RMA Group's on -call contract with EMWD, we provided grading <br />observation and testing, special inspection of reinforced concrete <br />construction, and other lab testing as needed for this 1MG tank installation <br />and valve/pipeline connection project. <br />NEW WATER QUALITY LABORATORY I CHINO, CA <br />Owner: Inland Empire Utilities Agency <br />Contact: Jerry Burke 1 909.993,1548 <br />Project Status: 2016 - 2018 <br />Construction Cost: $17.8 Million <br />RMA Group observed and approved the preparation of existing ground, <br />observed placement, processing and compaction of fills, performed field <br />compaction tests of the processed existing ground and fills, laboratory testing <br />on soils, and prepared a comprehensive geotechnical report for this project. <br />PITCHESS DETENTION FACILITY RENOVATIONS/ <br />IMPROVEMENTS I LOS ANGELES, CA <br />Owner: County of Los Angeles <br />Contact: Greg Johnson 1626.458.1741 <br />Project Status: 2019 - 2020 <br />Construction Cost: $15.5 Million <br />RMA Group provided soils inspection and testing for excavation and backfill <br />and special inspections and testing for reinforced concrete, masonry, steel <br />fabrication, and anchor installation for this jail renovation project. <br />PHILLIPS RANCH ROAD / SR60 IMPROVEMENTS I POMONA, CA <br />Owner: City of Pomona <br />Contact: Matt Pilar 1909.620.2261 <br />Project Status: 2019 - 2020 <br />Construction Cost (total project): $107 Million <br />RMAGroup provided soils compaction testing for the backfill ofsubgrade soils <br />forthe replacement concrete ramps, curbs, gutters, and sidewalks within the <br />Caltrans right-of-way, part of an overall SR60 improvement project. <br />CAMERON AVENUE PAVEMENT REHAB I WEST COVINA, CA <br />Owner: City of West Covina <br />Contact: Miguel Hernandez 1626.939.8400 <br />Project Status: 2018 <br />Construction Cost: $950,000 <br />RMA Group provided construction inspection and testing for quality control <br />of the pavement rehabilitation conducted installing rubberized asphalt <br />concrete, repairing damaged curbs, gutters, and sidewalks, adjusting ramps, <br />and all appurtenant work. <br />RMA Group <br />Evon P+w, t Matters! www,mocompamrs com <br />RFP NO: 20-111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES „ <br />CITY OF SANTA ANA 20-1600-P SEPTEMBER 30, 2020 1 Page 10 <br />