Laserfiche WebLink
SAMPLE TASK ORDER B - CONCRETE PAVING" <br />ITEM <br />DESCRIPTION <br />CITY <br />UNIT <br />UNIT PRICE <br />TOTAL <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />$235.00 <br />$129,250.00 <br />2 <br />FCC Sidewalk (T=4") <br />2500 <br />SF <br />$11.50 <br />$28,750.60 <br />3 <br />FCC Curb Ramp <br />3000 <br />SF <br />$25.50 <br />$76,500.00' <br />4 <br />FCC Curb and Gutter (Type A-2-8) <br />100 <br />LF <br />$88.65 <br />$8,865.00 <br />5 <br />Furnish and Install #6 Pullbox <br />4 <br />EA <br />$1,950.00 <br />$7,800.00 <br />6 <br />Adjust Manhole to Finished Grade <br />5 <br />EA <br />$2,100.00 <br />$10,500.00 <br />7 <br />Catch Basin (Type "B," W=10' ) <br />1 <br />EA <br />$74,200.00 <br />$74,200.00 <br />8 <br />Remove and Replace 30" Reinforced Concrete Pipe <br />75 <br />LF <br />$1,700.00 <br />$127,500.00 <br />9 <br />Guard Rail Replacement (Caltrans RSP A77N4) <br />50 <br />LF <br />$465.00 <br />$23,250.05 <br />10 <br />Guard Rail Replacement Termination (Caltrans) <br />1 <br />EA <br />$8,000.00 <br />$8,000.06 <br />11 <br />Remove and Replace Chain Link R/W Fence <br />50 <br />LF <br />$145.00 <br />$7,250.00 <br />12 <br />Concrete Barrier Type 836 (Caltrans) <br />50 <br />LF <br />$725.50 <br />$36,275.00 <br />13 <br />Traffic Control Work <br />1 <br />LS <br />$32,032.001 <br />$32.032.00 <br />TOTAL $570,172.00 <br />