My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARDY AND HARPER, INC.
Clerk
>
Contracts / Agreements
>
H
>
HARDY AND HARPER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 11:50:40 AM
Creation date
6/2/2023 1:28:15 PM
Metadata
Fields
Template:
Contracts
Company Name
HARDY AND HARPER, INC.
Contract #
A-2023-076-04
Agency
Public Works
Council Approval Date
5/2/2023
Expiration Date
5/1/2023
Insurance Exp Date
4/15/2024
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ardy aH.,arp" inc. <br />`�"`� �' STATE <br />la�. Number 215952 <br />Project Understanding <br />1. Sidewalk Grinding: A one-man crew with a cement grinder and sweeper follows a <br />prescribed route planned by the Superintendent of Maintenance so that he can move <br />swiftly to each repair site and complete the work in a single visit, <br />2, Concrete Removal & Replacement: This includes sidewalk, curb, curb & gutter, cross <br />gutter, spandrel, and curb ramps. Saw cutting to remove damaged material is done first. <br />All debris is removed and hauled away from the site. For sites where roots are not <br />involved, concrete forms are anchored in position and concrete is poured, After the <br />concrete has cured a finish crew will remove the forms and backfill as necessary to give <br />the jobsite and clean and finished look. Any damaged sprinklers will then be repaired. <br />Repair sites laden with roots will be left open until a city contracted root grinding crew <br />can remove the roots. Once the roots are removed our crew will form and pour. If <br />required, we will then apply and compact any required asphalt. The area will then be <br />backfilled, and sprinklers repaired as necessary. <br />3. Road Maintenance: Saw cutting to remove damaged material will be completed first. A <br />remove and replace crew with a backhoe and dump truck will remove and haul away any <br />debris from the site. The site will then be capped, finished, and compacted unless the <br />depth needed requires a base course to be laid first. In which case, the base course will be <br />laid first and then the crew will cap and finish it. <br />4. Grading: Hardy & Harper, Inc. has all the necessary equipment to perform grading of <br />right-of-way and dirt access roads. <br />5. Traffic Control: Traffic control is dependent on the type of work being executed. Major <br />arterials may require additional cones, arrow boards, CMS boards, lane closure/detour <br />signs and flagger(s). Residential work may only require cones and lane closures. We <br />access each location prior to mobilization to ensure that all proper and necessary traffic <br />control is in place for each designated repair. The safety of our employees and the <br />traveling public is always a top priority. <br />6. Response Time and Staging Area: A two to four hour show up time is obtainable for a <br />Foreman and Superintendent to arrive on site for all areas. Hardy & Harper, Inc.'s staging <br />area is located at 28585 Highway 74, Perris, CA 92570. <br />7. Warranty: Hardy & Harper, Inc. provides and one (1) year warranty on all workmanship <br />and materials provided. <br />32 RANCHO CIRCLE I LAKE FOREST, CA 92630 1 (714) 444-1851 • FAX (714) 444-2801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.