Laserfiche WebLink
ACCOUNT MISCELLANEOUS FEE UNIT ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGES <br />PUBLIC WORKS AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION XII <br />Trench Cut Fees <br />Changes based on Engineering News Record <br />Dry Utilities <br />05817002-53704 Arterial Street Resurfaced between 0 and 5 years 23.00 24.00 <br />Resurfaced between 6 and 10 years 20.00 21.00 <br />Resurfaced between 11 and 15 years 19.00 20.00 <br />Resurfaced between 16 and 20 years 15.00 16.00 <br />05817002-53705 Local Street Resurfaced between 0 and 5 years 15.00 16.00 <br />Resurfaced between 6 and 10 years 14.00 15.00 <br />Resurfaced between 11 and 15 years 13.00 14.00 <br />Resurfaced between 16 and 20 years 12.00 12.00 <br />Resurfaced between 21 and 25 years 10.00 10.00 <br />Wet Utilities <br />05817002-53704 Arterial Street Resurfaced between 0 and 5 years 36.00 37.00 <br />Resurfaced between 6 and 10 years 31.00 32.00 <br />Resurfaced between 11 and 15 years 30.00 31.00 <br />Resurfaced between 16 and 20 years 24.00 25.00 <br />05817002-53705 Local Street Resurfaced between 0 and 5 years 24.00 25.00 <br />Resurfaced between 6 and 10 years 21.00 22.00 <br />Resurfaced between 11 and 15 years 20.00 21.00 <br />Resurfaced between 16 and 20 years 18.00 19.00 <br />Resurfaced between 21 and 25 years 16.00 17.00 <br />10117002-53740 Small Cell Application Fee for City Facilities Per Application/Location 1,803.00 1,877.00 <br />01117002-53741 Annual Small Cell Compliance Inspection & Program Oversight Fee Per Installation 268.00 279.00 <br />06017002-53709 Water Capacity Fee <br />5/8" Meter 963.00 930.00 Modified Fee <br />3/4" Meter 1,444.00 1,395.00 Modified Fee <br /> 1" Meter 2,406.00 2,325.00 Modified Fee <br />1.5" Meter 4,813.00 4,650.00 Modified Fee <br /> 2" Meter 7,700.00 7,440.00 Modified Fee <br /> 3" Meter 16,845.00 16,275.00 Modified Fee <br /> 4" Meter 29,295.00 30,496.00 <br /> 6" Meter 60,450.00 62,928.00 <br />05317002-51708 CIP Construction Permit Deposit Per Permit $349.19 + up to 8.75% 376.00 Modified Fee/Name/Account <br />08617002 CIP Construction Permit Fee of Contract Amount <br />Page 106 of 148