Laserfiche WebLink
Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Proposed Fee: Actual Cost <br /> <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br /> <br />11. Work Performance & Payment - Deposit (Refundable) <br />Based on approved Engineer’s estimate <br /> <br />Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Proposed Fee: Actual Cost <br /> <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br /> <br />12. Omnibus Concrete - Deposit (Non-Refundable) <br />Based on approved Engineer’s estimate <br /> <br />Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Proposed Fee: Actual Cost <br /> <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br /> <br />13. Developer Contribution - Deposit (Non-Refundable) <br />Based on approved Engineer’s estimate <br /> <br />Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule <br />Proposed Fee: Actual Cost <br /> <br />Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and <br />mapping. <br /> <br />14. Accelerated Improvement Plan Check Initial Deposit (Streets, Utilities, Maps, etc.) <br /> <br />Page 146 of 148