Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />MISCELLANEOUS FEE <br />53600 PRELIMINARY REVIEW OF BUILDING 107.91 112.33 <br />STANDARDS COMPLIANCE <br />09801001-24015 SIGNS <br />When a permit is required for an illuminated or non-illuminated <br />sign, the owner shall provide the City a cash or surety bond <br />as described in Section 8-1768 through 8-1771 of the Santa Ana <br />Municipal Code. The amount of the bond shall be established <br />by the Building Official, but shall not be less than $20 per <br />address. <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />MECHANICAL PLAN CHECK FEES <br />Whenever mechanical plans are required by the Building <br />Official, plan check fees shall be 65% of the mechanical <br />permit fee and shall be paid at the time of submitting plans. <br />PLUMBING PLAN CHECK FEES <br />Whenever plumbing plans are required by the Building <br />Official, plan check fees shall be 65% of the plumbing <br />permit fee and shall be paid at the time of submitting plans. <br />Minimum Fee <br />Per Hour <br />Page 81 of 148