My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NUVIS
Clerk
>
Contracts / Agreements
>
N
>
NUVIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:23:24 PM
Creation date
6/13/2023 8:26:59 AM
Metadata
Fields
Template:
Contracts
Company Name
NUVIS
Contract #
A-2023-089-05
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
10/29/2024
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demolition plans and construction plans for new <br />playground paying tribute to Corona's historic Grand Circle <br />Raceway/Grand Boulevard with a racetrack themed <br />renovation to an existing park. <br />2022 <br />Corona <br />NUVIS PM R. Stone <br />Demolition and construction documents for renovation of <br />Year <br />playground equipment and surfacing at an existing park <br />Completed <br />including grading and drainage plans, coordination with <br />Client Name <br />City selected play equipment and surfacing vendors, <br />Contact <br />development of PS&E for park improvements. <br />Preliminary plans, concept simulations, construction <br />documents, and construction support for a 7,000 SF native, <br />low water use demonstration garden at CBMWD office, <br />adjacent to Interstate 5 Freeway, featuring three (3) <br />NUVIS-designed interpretive panels, canopy downspout <br />bio-infiltration swales, and habitat gardens representing <br />chaparral, coastal sage scrub, and butterfly -pollinator <br />species. Landscape scope also included restoration of an <br />existing fence and wall, protection of mature trees, <br />upgrades to an existing informational signage kiosk, and <br />Preliminary plans, shade modeling, and construction <br />documents, partially funded by a Community Development <br />Block Grant, for ADA circulation improvements to an existing <br />park. 2-acres of new accessible enriched concrete paving <br />and resilient surfacing, play structures, accessible picnic <br />tables, bbqs and hot coal receptacles under shade <br />structures, bike racks, seating, themed site amenities, high - <br />efficiency irrigation, shade trees, and shrub and turf planting. <br />Preliminary plans and construction documents for a 2.5- <br />acre park renovation including new accessible paving, <br />themed fence panels, DG infield, turf open space, high - <br />efficiency irrigation, picnic areas, raised community garden <br />beds, refreshed rubberized playground surfacing, guardrail <br />at stage, bleachers, turf block maintenance access, <br />signage, and curb ramps. <br />2022 <br />Tracy Martin <br />951-736-2266 <br />Year 2021 <br />Client Name Central Basin <br />Municipal Water <br />District <br />Contact Dr. Alex Roias <br />NUVIS PM P. <br />Year <br />of Irvine <br />Name <br />Contact Rachel McLure <br />Sr. Planner <br />949-724-6001 <br />NUVIS PM T. Munoz <br />Year 2021 <br />Client Name City of Tustin <br />Contact Jason Churchill <br />Field Svc Mgr. <br />NUVIS PM P. Cardoza <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.