My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLACEWORKS (4)
Clerk
>
Contracts / Agreements
>
P
>
PLACEWORKS (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:23:52 PM
Creation date
6/13/2023 8:27:11 AM
Metadata
Fields
Template:
Contracts
Company Name
PLACEWORKS
Contract #
A-2023-089-06
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
10/29/2024
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,, 4 <br />LAKESIDE GREEN STREETS <br />Connecting Downtown Oakland to Lake Merritt <br />rrr <br />Place Works worked with the City of Oakland to develop a <br />comprehensive urban greening retrofit along Oakland's iconic Lake <br />Merritt, as outlined in the 2002 Lake Merritt Master Plan. The <br />intersection of Lakeside Drive and Harrison Street was completely <br />reconfigured, and this task served as an opportunity for narrowing and <br />removing paved areas and applying complete streets principles, building <br />roadway rain gardens, and improving the urban character, walkability, <br />and user experience at the lake. The project creates a new pedestrian - <br />and bicycle -friendly multimodal corridor connection along Lakeside <br />Drive and Harrison Street, Adjacent Snow Park was also redesigned, and <br />new features were added to meet the needs of the local community. <br />These include a new state-of-the-art terraced play area and a pedestrian <br />promenade, with a central rain garden featuring a custom art piece <br />by local artists WowHaus. The sculpture represents a mythical water - <br />dwelling creature that connects the site's location near the lake and <br />the rainwater elements in the park. The project was designed to meet <br />Bay -Friendly Landscape standards, including permeable and high-albedo <br />paving, native and climate adapted plantings, and high recycled content <br />in all purchased materials. <br />A-58 <br />Location <br />Oakland, California <br />Size <br />14 acres; 0.5 mile trail <br />Client <br />City of Oakland Community & <br />Economic Development Agency <br />Date Completed <br />June 2019 <br />Construction Cost <br />$11.7 Million <br />Services Provided <br />Landscape Architecture, Urban Design, <br />Community Outreach and Facilitation, <br />Bicycle and Pedestrian Planning, <br />Stormwater Management, Complete <br />Streets Design, Streetscape Design, <br />Green Streets, Waterfront Design, <br />Accessible Design, Park Restoration, <br />CEQA, Construction Administration <br />® PLACEWORKS <br />
The URL can be used to link to this page
Your browser does not support the video tag.