My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 8:17:00 AM
Creation date
6/13/2023 8:31:28 AM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP, INC.
Contract #
A-2023-089-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/30/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cordova Park Renovation <br />Mission Viejo, CA <br />Completion Date: 2018 <br />Project Size: 4 Acres <br />Design Cost: $44,S00 <br />Construction Cost: $1.18M <br />Project Summary <br />Client Reference <br />Keith Rattay <br />Assistant City Manager <br />City of Mission Viejo <br />200 Civic Center Drive <br />Mission Viejo, CA 92691 <br />(949) 470-3014 1 krattay@cityofmissionviejo.org <br />The Cordova Park renovation encompassed a complete overhaul of the existing play area, as <br />well as the addition of improvements to the trail system through the neighbouring greenbelt. <br />Outdated play equipment and safety surfacing was replaced with the latest in modern play <br />features and rubber surfacing, dubbing the new area as "The Hive" Littered with thematic play <br />elements, interpretive educational signage, color schemes, and even sculptural elements, park <br />visitors are engaged not only physically but intellectually. Hexagonal -shaped conversational <br />seating areas dot the play area like a honeycomb, pulling parents into the acts of play. <br />Wooden split -rail fences keep children safe by corralling them along the asphalt trails, away from <br />the surrounding residential streets and into the play area. The trails were all re -surfaced and <br />finished with pedestrian lighting to keep the greenbelt safe and visible for residents. <br />Project Team <br />Principal: Larry Ryan <br />R, J M DESIGN <br />Project Manager: Eric Chastain GROUP <br />16 1 City of Santa Ana • On -Call Landscape Architectural Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.