My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 8:17:00 AM
Creation date
6/13/2023 8:31:28 AM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP, INC.
Contract #
A-2023-089-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/30/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Esencia Sports Park <br />Rancho Mission Viejo, CA <br />Project Completion: 2020 Client Reference <br />Project Size: 30 acres Jennifer Taylor <br />Design Cost: $1,887,600 Senior Project Manager <br />Construction Cost: $24M Rancho Mission Viejo Company <br />28811 Ortega Highway <br />San Juan Capistrano, CA 92693 <br />(949) 240-3363 1 jtaylor@ranchomv.com <br />Project Summary <br />Orange County's newest community, Rancho Mission Viejo, is located off Ortega Highway in South Orange <br />County. It is home to a master planned 30 acre sports park unlike any other. Nestled in a natural rolling <br />southern California landscape setting the environmental design of Esencia Sports Park is modeled after <br />ranch industrialized facilities with board form buildings, steel I-beam shade structures, lighting, <br />and landscape. <br />This rustic sports park offers both private and public amenities including: two (2) baseball fields, one (1) <br />softball field, custom designed restroom and concessions building, one (1) synthetic multi -use field, one <br />(1) playground, two (2) dedicated tennis and eight (8) dedicated pickle ball courts, and parking. Additional <br />passive support amenities include hiking trails, exercise stations, and picnicing. <br />The sports park also offers community aquatic facilities overlooking the park complete with restrooms, a <br />splash pad, lap swim lanes, open recreational swimming, as well as BBQ and cabana lounge areas. The site <br />itself was designed to eliminate the need for expensive retaining walls while maximizing the buildable area <br />through terraced pads and elevated concourses. The resulting design created hillside terraced seating, and <br />elevated concessions allowing for maximum spectator viewing opportunities in a cost effective manner. <br />The new Esencia Sports Park is designed to fulfill much of the recreational needs identified for this <br />new community. <br />Project Team <br />Principal: <br />Project Manager: <br />Larry P. Ryan <br />Zachary Mueting <br />I <br />commw;tyrn fired Span Mir <br />J DESIGN <br />GROUP <br />18 1 City of Santa Ana • On -Call Landscape Architectural Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.